共 33 条
[3]
[Anonymous], PROC 1ST INT WORKSHO
[5]
Caicedo J.M., 2003, J STRUCTURAL CONTROL, V10, P137
[7]
CAICEDO JM, 2003, THESIS WASHINGTON U
[9]
CLAYTON EH, 2005, 2005 INT S INT CONTR
[10]
Phase I benchmark control problem for seismic response of cable-stayed bridges
[J].
JOURNAL OF STRUCTURAL ENGINEERING-ASCE,
2003, 129 (07)
:857-872