共 50 条
- [1] Status of the cryogenic system commissioning at SNS 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 3848 - 3850
- [2] SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K ADVANCES IN CRYOGENIC ENGINEERING, 2017, 278
- [3] Commissioning experience for the SNS Linac High Intensity and High Brightness Hadron Beams, 2005, 773 : 73 - 78
- [4] Commissioning of the SuperKEKB final focusing superconducting magnet cryogenic systems 27TH INTERNATIONAL CRYOGENICS ENGINEERING CONFERENCE AND INTERNATIONAL CRYOGENIC MATERIALS CONFERENCE 2018 (ICEC-ICMC 2018), 2019, 502
- [5] The commissioning of the SNS superconducting linac NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2007, 261 (1-2): : 1036 - 1039
- [6] SNS warm linac commissioning results 2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 1408 - 1412
- [7] SNS Linac commissioning - Transverse matching PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 2652 - 2654
- [9] Preliminary commissioning of cryogenic system of BESIII ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 461 - +
- [10] Commissioning of cryogenic preamplifiers for SAPHIRA detectors HIGH ENERGY, OPTICAL, AND INFRARED DETECTORS FOR ASTRONOMY VIII, 2018, 10709