Availability Approach to Optimizing Railway Track Renewal Operations

被引:40
作者
Caetano, Luis Filipe [1 ]
Teixeira, Paulo Fonseca [1 ]
机构
[1] Univ Tecn Lisboa, CESUR, Dept Civil Engn, IST, P-1049001 Lisbon, Portugal
关键词
Railroad tracks; Maintenance; Life cycles; Optimization; Railway track; Track maintenance; Track renewal; Life-cycle cost; Availability; Multiobjective optimization; Nonsorting genetic algorithm 2 (NSGA2); MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHMS; MAINTENANCE; SLEEPERS;
D O I
10.1061/(ASCE)TE.1943-5436.0000575
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a multiobjective optimization approach for planning railway ballast, rail, and sleeper renewal operations. The objective is to support an informed decision that considers not only the railway track life-cycle cost (LCC) but also the track occupation times required to perform interventions. Two objective functions were minimized, as follows: (1)railway track unavailability caused by railway track maintenance and renewal operations, and (2)railway track components' LCC. Furthermore, to rationalize the renewal strategy, the model considers a multicomponent formulation that assesses, in time and space, the opportunistic combination of railway track renewal activities. A numerical application of the model on a real case study (Lisbon-Oporto line) is developed and discussed. The results show the interest of using this simple multiobjective optimization approach to obtain a decision-making process to support the scheduling of major railway track renewal works with an informed LCC-unavailability trade-off. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:941 / 948
页数:8
相关论文
共 29 条
[1]  
Andrade A., 2013, P ICE TRANSP, V166, P1
[2]   Uncertainty in Rail-Track Geometry Degradation: Lisbon-Oporto Line Case Study [J].
Andrade, A. Ramos ;
Teixeira, P. Fonseca .
JOURNAL OF TRANSPORTATION ENGINEERING, 2011, 137 (03) :193-200
[3]  
[Anonymous], MATLAB VERS R2010A C
[4]  
[Anonymous], 2007, EVOLUTIONARY ALGORIT
[5]  
[Anonymous], 2008, Monte Carlo Methods
[6]  
Automated and Cost-Effective Railway Infrastructure Maintenance (ACEM-Rail), 2011, D1 1 REP STAT PRACT
[7]   Trade-Off Analysis for Multiobjective Optimization in Transportation Asset Management by Generating Pareto Frontiers Using Extreme Points Nondominated Sorting Genetic Algorithm II [J].
Bai, Qiang ;
Labi, Samuel ;
Sinha, Kumares C. .
JOURNAL OF TRANSPORTATION ENGINEERING, 2012, 138 (06) :798-808
[8]   Scheduling preventive railway maintenance activities [J].
Budai, G. ;
Huisman, D. ;
Dekker, R. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (09) :1035-1044
[9]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[10]  
Deb K., 2010, MULTIOBJECTIVE OPTIM