共 47 条
[2]
[Anonymous], 1981, SYSTEMS ANAL MANAGEM
[3]
[Anonymous], TP2903 NASA
[4]
[Anonymous], 1991, Proceedings of the ASME International Design Engineering Technical Conferences (Design Theory Methodology Conference)
[5]
[Anonymous], 1987, SIMULATED ANNEALING
[6]
Austin S., 2000, PROJECT MANAGEMENT J, V31, P48, DOI DOI 10.1177/875697280003100206
[7]
Austin S., 2000, Construction Management and Economics, V18, P173, DOI DOI 10.1080/014461900370807
[8]
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[9]
Browning T, 1998, Modeling and analyzing cost, schedule, and performance in complex system product development
[10]
Browning T. R., 2003, Systems Engineering, V6, P49, DOI 10.1002/sys.10034