Groundwater characterization of a heterogeneous granitic rock massif for shallow tunneling

被引:9
作者
Font-Capo, J. [1 ,2 ]
Vazquez-Sune, E. [1 ]
Carrera, J. [1 ]
Herms, I. [3 ]
机构
[1] CSIC, Inst Environm Assessment & Water Res IDAEA, ES-08034 Barcelona, Spain
[2] Univ Politecn Cataluna, Dept Geotech Engn & Geosci, BarcelonaTech, ES-08034 Barcelona, Spain
[3] Gestio Projectes SA, GEOCAT, Barcelona 08029, Spain
关键词
Inflow; Shallow tunneling; Fault-zone; Modeling; CRYSTALLINE THRUST SHEETS; FAULT ZONE ARCHITECTURE; WATER-CONVEYANCE TUNNEL; DAMAGE ZONE; FLUID-FLOW; INTERNAL STRUCTURE; DIVERSION PROJECT; INFLOW PREDICTION; PUMPING TESTS; PERMEABILITY;
D O I
10.1344/105.000001773
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Shallow tunneling may encounter a number of problems, the most important of which is high water inflows in transmissive areas that are often associated with fractures or discontinuities. Moreover, research into shallow tunneling may be limited by the duration and cost of the civil engineering works. Two important aspects that are often overlooked are: variable groundwater behavior of faults (conduit, barrier, conduit-barrier), and role of groundwater connectivity between fractures that cross the tunnel and the rest of the rock massif. These two aspects should be taken into account in the geological and groundwater characterization to correct the tunnel design and minimize hazards. A geological study and a preliminary hydrogeological characterization (including a prior steady state investigation and cross bore-hole tests) were carried out in a granitic sector during the construction of Line 9 of the Barcelona subway (B-20 area). The hydrogeological conceptual model was constructed using a quasi-3D numerical model, and different scenarios were calibrated. Faults and dikes show a conduit-barrier behavior, which partially compartmentalized the groundwater flow. The barrier behavior, which is the most marked effect, is more prominent in faults, whereas conduit behavior is more notable in dikes. The characterization of groundwater media entailed a dewatering plan and changes in the tunnel course. This enabled us to construct the tunnel without any problems.
引用
收藏
页码:395 / 408
页数:14
相关论文
共 83 条