The effect of ordering policies for a manufacturing cell changing to lean production

被引:4
作者
Bhat, S. [1 ]
机构
[1] Dr MGR Univ, Dept Mech Engn, Bangalore 560043, Karnataka, India
关键词
lean production; ordering policies; supplier performance; demand variability;
D O I
10.1243/09544054JEM1216
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Over the past two decades, lean production has been replacing traditional manufacturing techniques around the world, mainly owing to the success of the Toyota Motor Company. One key to Toyota's success that many Indian companies have not been able to emulate is the transformation of their suppliers to the lean philosophy. The focus of this research is analysing the impact of ordering policies for supplied parts of a manufacturing cell utilizing lean production techniques. This paper presents a simulation analysis of a multi-stage, lean manufacturing cell that produces a family of products. The analysis investigates how the ordering policy for supplied parts affects the performance of the cell under conditions of demand variability and imperfect supplier performance. The ordering policies evaluated are a periodic-review inventory control policy and two Kanban policies. The performance of the cell is measured by the flow time of the product through the cell, the on-time-delivery to the customer, the number of products shipped each week, the amount of work-in-process inventory in the cell, the approximate percentage of time the cell was stocked out, and the average supplied part inventory levels for the cell.
引用
收藏
页码:1551 / 1560
页数:10
相关论文
共 16 条
[1]  
[Anonymous], 2001, SUPPLY CHAIN MANAG, DOI DOI 10.1108/EUM0000000005709
[2]   Ranking of generalised multi-stage KANBAN policies [J].
Axsäter, S ;
Rosling, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (03) :560-567
[3]  
Banks J., 1999, DISCRETE EVENT SIMUL
[4]   Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study [J].
Detty, RB ;
Yingling, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (02) :429-445
[5]   Analysis of an inventory system under supply uncertainty [J].
Güllü, R ;
Önol, E ;
Erkip, N .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :377-385
[6]   Criterion for choosing ordering policies between fixed-size and fixed-interval, pull-type and push-type [J].
Hoshino, K .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) :91-95
[7]   Successful implementation of TPS in a manufacturing setting: a case study [J].
Kasul, RA ;
Motwani, JG .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1997, 97 (7-8) :274-+
[9]  
Monden Y., 1998, Toyota Production System - An Integrated Approach to Just-in-Time
[10]  
Nahmias S., 1997, Production and operations analysis, V3rd