Optimization of Project Schedule Crashing

被引:0
|
作者
Shrestha, Kabindra K. [1 ]
Shrestha, Pramen P. [1 ]
机构
[1] Univ Nevada, Howard R Hughes Coll Engn, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
Tool; Schedule; Crashing; Optimization; Cost; Change order;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In construction projects, problems regarding time overruns could be tackled by means of schedule crashing; however, this could be a very lengthy process if done manually. Normally, schedule crashing leads to cost overruns, so should be done in such a way that its negative effects are minimal on the cost of the project. This study developed a tool that applies an optimization technique to determine the best solution for schedule crashing problems. This tool requires a complete activity network as input, and calculates the best optimal solution for project schedule crashing. Several factors were considered while computing the optimized schedule, such as the overhead cost required to run the construction project, rewards in case of early completion, and penalties for late completion. Effective implementation of this tool could help to save time otherwise spent on calculating optimal solutions by using iterative methods. This tool offers flexibility in controlling the total project duration by a reasonable amount, thus reducing the negative effects of the change orders associated with time extensions.
引用
收藏
页码:708 / 717
页数:10
相关论文
共 50 条
  • [41] Activity modes selection for project crashing through deterministic simulation
    Mohanty, Ashok
    Mishra, Jibitesh
    Satpathy, Biswajit
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2011, 4 (04): : 610 - 623
  • [42] Solution of fuzzy multi-objective project crashing problem
    Gocken, Tolunay
    NEURAL COMPUTING & APPLICATIONS, 2013, 23 (7-8): : 2167 - 2175
  • [43] The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network
    Lei, Yu
    Xu, Hu
    Zhang, Ruyu
    Ding, Yan
    Lin, Jianfeng
    Liu, Lirong
    Qin, Lei
    PROCEEDINGS OF THE 2015 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING SCIENCE AND ENGINEERING, 2016, 32 : 248 - 255
  • [44] Risk-based optimization of the debt service schedule in renewable energy project finance
    Firouzi, Afshin
    Meshkani, Ali
    UTILITIES POLICY, 2021, 70 (70)
  • [45] Diavik diamond project is on schedule
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2002, 203 (08): : 8 - 8
  • [46] SPARK FOR KEEPING A PROJECT ON SCHEDULE
    BROWN, HK
    MACHINE DESIGN, 1969, 41 (11) : 138 - &
  • [47] Project Schedule Forecasting for Skyscrapers
    Li, Yongkui
    Lu, Keyu
    Lu, Yujie
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
  • [48] IMPACT OF CHANGES ON PROJECT SCHEDULE
    NEIL, JM
    33RD ANNUAL MEETING OF THE AMERICAN ASSOCIATION OF COST ENGINEERS, 1989, : S61 - S69
  • [49] NSFI PROJECT AHEAD OF SCHEDULE
    RODDEN, G
    PULP & PAPER-CANADA, 1982, 83 (06) : 37 - &
  • [50] HOW TO KEEP A PROJECT ON SCHEDULE
    SHANE, PS
    MACHINE DESIGN, 1977, 49 (07) : 68 - 70