Optimization of Project Schedule Crashing

被引:0
|
作者
Shrestha, Kabindra K. [1 ]
Shrestha, Pramen P. [1 ]
机构
[1] Univ Nevada, Howard R Hughes Coll Engn, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
Tool; Schedule; Crashing; Optimization; Cost; Change order;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In construction projects, problems regarding time overruns could be tackled by means of schedule crashing; however, this could be a very lengthy process if done manually. Normally, schedule crashing leads to cost overruns, so should be done in such a way that its negative effects are minimal on the cost of the project. This study developed a tool that applies an optimization technique to determine the best solution for schedule crashing problems. This tool requires a complete activity network as input, and calculates the best optimal solution for project schedule crashing. Several factors were considered while computing the optimized schedule, such as the overhead cost required to run the construction project, rewards in case of early completion, and penalties for late completion. Effective implementation of this tool could help to save time otherwise spent on calculating optimal solutions by using iterative methods. This tool offers flexibility in controlling the total project duration by a reasonable amount, thus reducing the negative effects of the change orders associated with time extensions.
引用
收藏
页码:708 / 717
页数:10
相关论文
共 50 条
  • [31] Pre-Project Schedule Optimization of Airport Based on Design Structure Matrix
    Le Y.
    Sun Q.
    Chen J.
    Tang K.
    Tongji Daxue Xuebao/Journal of Tongji University, 2020, 48 (10): : 1523 - 1529
  • [32] Fuzzy optimization of construction engineering project schedule based on critical chain management
    Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
  • [33] Network Comprehensive Optimization for Schedule and Cost in Project Construction Based on PSO Algorithm
    Huang, Yuansheng
    Qiu, Zilong
    Zhang, Weina
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1260 - 1264
  • [34] Research on Optimization of Schedule-Cost Risk for R&D Project
    Li, Ping
    Ma, Chao
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 284 - 289
  • [35] Automatically creating a Crashing-based schedule Plan as Countermeasures against Process Delay
    Kinoshita, Daisuke
    Hashiura, Hiroaki
    Yaegashi, Rihito
    Uchikawa, Hiroki
    Uenosono, Kazuhiro
    Komiya, Seiichi
    DISTANCE LEARNING, MULTIMEDIA AND VIDEO TECHNOLOGIES, 2008, : 67 - 74
  • [36] An unsupervised cross project model for crashing fault residence identification
    Liu, Xiao
    Xu, Zhou
    Yang, Dan
    Yan, Meng
    Zhang, Weihan
    Zhao, Haohan
    Xue, Lei
    Fan, Ming
    IET SOFTWARE, 2022, 16 (06) : 630 - 646
  • [37] Fuzzy activity times in critical path and project crashing problems
    Liu, ST
    CYBERNETICS AND SYSTEMS, 2003, 34 (02) : 161 - 172
  • [38] Solution of fuzzy multi-objective project crashing problem
    Tolunay Göçken
    Neural Computing and Applications, 2013, 23 : 2167 - 2175
  • [39] Identifying Crashing Fault Residence Based on Cross Project Model
    Xu, Zhou
    Zhang, Tao
    Zhang, Yifeng
    Tang, Yutian
    Liu, Jin
    Luo, Xiapu
    Keung, Jacky
    Cui, Xiaohui
    2019 IEEE 30TH INTERNATIONAL SYMPOSIUM ON SOFTWARE RELIABILITY ENGINEERING (ISSRE), 2019, : 183 - 194
  • [40] Construction project planning using integration of crashing and concurrency techniques
    Hady, Haider Najy
    AL-Kindi, Luma Adnan
    Mahmoud, Mahmoud A.
    4TH INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, 2020, 737