Optimization of Project Schedule Crashing

被引:0
|
作者
Shrestha, Kabindra K. [1 ]
Shrestha, Pramen P. [1 ]
机构
[1] Univ Nevada, Howard R Hughes Coll Engn, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
Tool; Schedule; Crashing; Optimization; Cost; Change order;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In construction projects, problems regarding time overruns could be tackled by means of schedule crashing; however, this could be a very lengthy process if done manually. Normally, schedule crashing leads to cost overruns, so should be done in such a way that its negative effects are minimal on the cost of the project. This study developed a tool that applies an optimization technique to determine the best solution for schedule crashing problems. This tool requires a complete activity network as input, and calculates the best optimal solution for project schedule crashing. Several factors were considered while computing the optimized schedule, such as the overhead cost required to run the construction project, rewards in case of early completion, and penalties for late completion. Effective implementation of this tool could help to save time otherwise spent on calculating optimal solutions by using iterative methods. This tool offers flexibility in controlling the total project duration by a reasonable amount, thus reducing the negative effects of the change orders associated with time extensions.
引用
收藏
页码:708 / 717
页数:10
相关论文
共 50 条
  • [21] Fuzzy comprehensive optimization of hydropower project schedule with consideration of investment and risk
    Liu, Dong-Hai
    Gao, Xing-Fu
    Pan, Yao
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2008, 41 (09): : 1109 - 1115
  • [22] Project Acceleration via Activity Crashing, Overlapping, and Substitution
    Vinhaes Gerk, Jose Eduardo
    Qassim, Raad Yahya
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2008, 55 (04) : 590 - 601
  • [23] Distributionally robust project crashing with partial or no correlation information
    Ahipasaoglu, Selin Damla
    Natarajan, Karthik
    Shi, Dongjian
    NETWORKS, 2019, 74 (01) : 79 - 106
  • [24] ANALYSIS OF A MULTI-CRITERIA PROJECT CRASHING MODEL
    MOORE, LJ
    TAYLOR, BW
    CLAYTON, ER
    LEE, SM
    AIIE TRANSACTIONS, 1978, 10 (02): : 163 - 169
  • [25] Sustainable Green City Development Project Analysis using the Critical Path Method (CPM) and the Crashing Project Method on Time and Cost Optimization
    Abuhasel, Khaled
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2023, 13 (03) : 10973 - 10977
  • [26] A NETWORK FLOW PROCEDURE FOR PROJECT CRASHING WITH PENALTY NODES
    KANDA, A
    RAO, URK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1984, 16 (02) : 174 - 182
  • [27] Automatically creating a schedule plan as countermeasures by means of "crashing" against process delay
    Yaegashi, R
    Kinoshita, D
    Hashiura, H
    Uenosono, K
    Komiya, S
    KNOWLEDGE-BASED SOFTWARE ENGINEERING, 2004, 108 : 24 - 36
  • [28] Research on project schedule
    Wan Xiaobing
    Bai Sijun
    Guo Yuntao
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 531 - 534
  • [30] Dynamic Optimization for Analyzing Effects of Multiple Resource Failures on Project Schedule Robustness
    Ramin Ansari
    KSCE Journal of Civil Engineering, 2021, 25 : 1515 - 1532