Optimization of Project Schedule Crashing

被引:0
|
作者
Shrestha, Kabindra K. [1 ]
Shrestha, Pramen P. [1 ]
机构
[1] Univ Nevada, Howard R Hughes Coll Engn, Dept Civil & Environm Engn & Construct, 4505 S Maryland Pkwy, Las Vegas, NV 89154 USA
关键词
Tool; Schedule; Crashing; Optimization; Cost; Change order;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In construction projects, problems regarding time overruns could be tackled by means of schedule crashing; however, this could be a very lengthy process if done manually. Normally, schedule crashing leads to cost overruns, so should be done in such a way that its negative effects are minimal on the cost of the project. This study developed a tool that applies an optimization technique to determine the best solution for schedule crashing problems. This tool requires a complete activity network as input, and calculates the best optimal solution for project schedule crashing. Several factors were considered while computing the optimized schedule, such as the overhead cost required to run the construction project, rewards in case of early completion, and penalties for late completion. Effective implementation of this tool could help to save time otherwise spent on calculating optimal solutions by using iterative methods. This tool offers flexibility in controlling the total project duration by a reasonable amount, thus reducing the negative effects of the change orders associated with time extensions.
引用
收藏
页码:708 / 717
页数:10
相关论文
共 50 条
  • [1] A trapezoidal intuitionistic fuzzy optimization approach for crashing a budget constrained project
    Kasimoglu, Fatih
    Bayeg, Selami
    Pinar, Adem
    Utku, Durdu Hakan
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (04)
  • [2] A Hybrid Approach for Project Crashing Optimization Strategy with Risk Consideration: A Case Study for an EPC Project
    Ou-Yang, Chao
    Chen, Wang-Li
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [3] RESOURCE CONSTRAINED PROJECT CRASHING
    DECKRO, RF
    HEBERT, JE
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1989, 17 (01): : 69 - 79
  • [4] A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION
    Kuhl, Michael E.
    Tolentino-Pena, Radhames A.
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2370 - 2376
  • [5] Application of particle swarm optimization in synthetic optimization of project schedule
    Huang, Yuansheng
    Zhang, Weina
    Qi, Jianxun
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3475 - 3479
  • [6] Target-based project crashing problem by adaptive distributionally robust optimization
    Li, Yuanbo
    Cui, Zheng
    Shen, Houcai
    Zhang, Lianmin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157
  • [7] The researches on the optimization of overall construction schedule for railway project
    Liu, YS
    Zeng, XG
    PROCEEDINGS OF '97 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 1997, : 182 - 186
  • [8] On the potential of process simulation in software project schedule optimization
    Padberg, F
    Proceedings of the 29th Annual International Computer Software and Applications Conference, Workshops and Fast Abstracts, 2005, : 127 - 130
  • [9] Optimization for limited resource schedule in public construction project
    Li, Hanwen
    Luo, Fuzhou
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1639 - 1643
  • [10] Schedule Collaborative Optimization for the Engineering Project Based on Stackelberg
    Xue, Weirui
    Zhang, Wei
    Wang, Xuetong
    Zhang, Lei
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 64 - 71