Floor Heave Mechanism of Gob-Side Entry Retaining with Fully-Mechanized Backfilling Mining

被引:43
|
作者
Gong, Peng [1 ]
Ma, Zhanguo [1 ]
Ni, Xiaoyan [1 ]
Zhang, Ray Ruichong [2 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, State Key Lab Geomech & Deep Underground Engn, Xuzhou 221116, Peoples R China
[2] Colorado Sch Mines, Dept Mech Engn, Golden, CO 80401 USA
基金
中国国家自然科学基金; 国家自然科学基金重大项目;
关键词
theoretical model; floor heave; gob-side entry retaining; gob-backfilled mining; STABILITY; ROOF;
D O I
10.3390/en10122085
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Serious floor heave in gob-side entry retaining (GER) with fully-mechanized gangue backfilling mining affects the transportation and ventilation safety of the mine. A theoretical mechanical model for the floor of gob-backfilled GER was established. The effects of the mechanical properties of floor strata, the granular compaction of backfilling area (BFA), the vertical support of roadside support body (RSB), and the stress concentration of the solid coal on the floor heave of the gob-backfilled GER were studied. The results show that the floor heave increases with the increase of the coal seam buried depth, and decreases with the increase of the floor rock elastic modulus. The development depth of the plastic zone decreases with the increase of the c and phi value of the floor rock, and increases with the increase of the stress concentration factor of the solid coal. The development depth of the plastic zone in the test mine reached 2.68 m. The field test and monitoring results indicate that the comprehensive control scheme of adjusting backfilling pressure, deep grouting reinforcement, shallow opening stress relief slots, and surface pouring can effectively control the floor heave. The roof-floor displacement is reduced by 73.8% compared to that with the original support scheme. The roadway section meets the design and application requirements when the deformation stabilizes, demonstrating the rationality of the mechanical model. The research results overcome the technical bottleneck of floor heave control of fully-mechanized backfilling GER, providing a reliable basis for the design of a floor heave control scheme.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] Research on Roof Cutting Pressure Relief of the Gob-Side Entry Retaining With Roadside Backfilling
    Zhang, Kun
    Liu, Changyou
    Zhang, Hanrui
    Yue, Xin
    Liu, Huaidong
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [42] Research on the Mechanical Properties of Flexible Material Backfilling Wall in Gob-Side Entry Retaining
    Pang, Dongdong
    Zhou, Yong
    Niu, Xingang
    He, Kai
    Li, Chuanming
    Chen, Zhongqi
    MINERALS, 2022, 12 (08)
  • [43] Study on surrounding rock control technology of "support and pressure relief" coordination for gob-side entry retaining of fully-mechanized caving in thick coal seam
    Wang D.
    Yang H.
    Yuan W.
    Chen B.
    Zhang B.
    Journal of Mining and Strata Control Engineering, 2022, 4 (04)
  • [44] Analysis on distribution law of the abutment pressure of the integrated coal beside the road-in packing for gob-side entry retaining in fully-mechanized caving face
    Zhu Chuanqu1
    2. School of Building
    EngineeringSciences, 2009, 7 (03) : 23 - 27
  • [45] The Blocking Mechanism of the Vertical Feeding System of Roadside Support Body Material for Backfilling Gob-Side Entry Retaining
    Gong, Peng
    Ma, Zhanguo
    Sun, Jian
    Zhang, Ray Ruichong
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [46] Deformation mechanism and control technology of gob-side entry retaining with roadside backfilling: a numerical analysis and field investigation
    Wang, Yinwei
    Zhao, Zhiqiang
    Zhang, Wenbo
    Wei, Xiaoxiang
    Hui, Zilong
    GEOMECHANICS AND GEOPHYSICS FOR GEO-ENERGY AND GEO-RESOURCES, 2024, 10 (01)
  • [47] Research on Gob-Side Entry Retaining Mining of Fully Mechanized Working Face in Steeply Inclined Coal Seam: A Case in Xinqiang Coal Mine
    Zhou, Xuming
    Li, Haotian
    Li, Xuelong
    Wang, Jianwei
    Meng, Jingjing
    Li, Mingze
    Mei, Chengwei
    SUSTAINABILITY, 2022, 14 (16)
  • [48] Study on the bearing characteristics and reasonable width of the backfilling body for gob-side entry in fully-mechanized top-coal caving face under the roof cutting condition
    Feng C.
    Liu S.
    Zhang X.
    Zhang Y.
    Jiang Y.
    Li Y.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2023, 40 (02): : 232 - 242
  • [49] Analysis and application in controlling surrounding rock of support reinforced roadway in gob-side entry with fully mechanized mining
    DENG Yuehua TANG Jianxin ZHU Xiangke FU Yong DAI Zhangyin College of Resources and Environmental Science Chongqing University Chongqing China Jingang Coal Mine Dazhu Coal Electric Group Dazhou China College of Mining Guizhou University Guiyang China
    MiningScienceandTechnology, 2010, 20 (06) : 839 - 845
  • [50] Analysis and application in controlling surrounding rock of support reinforced roadway in gob-side entry with fully mechanized mining
    Deng Y.
    Tang J.
    Zhu X.
    Fu Y.
    Dai Z.
    Mining Science and Technology, 2010, 20 (06): : 839 - 845