共 50 条
- [21] Mechanism and comprehensive control techniques for large deformation of floor heave in block filling gob-side entry retaining Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2022, 39 (02): : 335 - 346
- [22] Controlling mechanism of gob-side entry retaining without backfilling wall and its application Electronic Journal of Geotechnical Engineering, 2014, 19 (0Q): : 4321 - 4332
- [23] Industrial test of road-in packing for gob-side entry retaining in fully-mechanized coalface with top-coal caving Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2004, 33 (06): : 660 - 664
- [24] Floor Heave Control in Gob-Side Entry Retaining by Pillarless Coal Mining with Anti-Shear Pile Technology APPLIED SCIENCES-BASEL, 2024, 14 (12):
- [25] The rational width of the support body of gob-side entry in fully mechanized backfill mining Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2013, 30 (02): : 159 - 164
- [26] Surrounding rock control mechanism and its application of gob-side retaining entry in deep backfilling with large mining height Meitan Xuebao/Journal of the China Coal Society, 2014, 39 (12): : 2362 - 2368
- [29] Mechanism of deformation and pressure relief control of dynamic gob-side entry surroundings in fully-mechanized caving mining for extra-thick coal seam Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 (02): : 83 - 94
- [30] Failure mechanism and cable truss control of large-scale section gob-side entry roof with fully-mechanized caving Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2017, 34 (01): : 1 - 8