An Optimised Supplier Selection Plan for Supply Chain Integrated Project Scheduling Problem

被引:6
|
作者
Rahman, Humyun Fuad [1 ]
Chakrabortty, Ripon K. [2 ]
Ryan, Michael J. [1 ]
机构
[1] Univ New South Ales, Capabil Syst Ctr, Sch Engn & Informat Technol, Canberra, ACT, Australia
[2] Univ New South Wales, Sch Engn & Informat Technol, Canberra, ACT, Australia
来源
2019 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON) | 2019年
关键词
Project Scheduling; Supplier Selection; Memetic Algorithm; Supply Chain Cost; Case Study; MATERIAL ORDERING PROBLEM; GENETIC ALGORITHM; CONSTRUCTION; MODEL;
D O I
10.1109/temscon.2019.8813610
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project scheduling (PS) and supply chain management (SCM) are two broad areas that have attracted considerable research attention in recent years. However, the integration of SCM and PS has so far attracted little attention, which motivates this research to include supplier selection strategy in the integrated PS network. Primarily, the project attributes are considered as analogous to the very well-known resource constrained project scheduling problem (RCPSP), which are later integrated with simulated supplier data. After designing mathematical formulations for that integrated model, a genetic algorithm based memetic algorithm (MA) approach is proposed with the objective of minimizing supply chain backward (from supplier to project completion) cost. The proposed algorithm incorporates Nawaz, Enscore, and Ham (NEH) heuristic-based initialization with carefully designed crossover and local search techniques. An online case study model with simulated supplier attributes is considered and solved efficiently to justify the proposed approach. Finally, validation of the proposed MA has been carried out through comparison with a selected state-of-the-art algorithm.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Supplier evaluation for resilient project driven supply chain
    Shishodia, Anjali
    Verma, Priyanka
    Dixit, Vijaya
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 129 : 465 - 478
  • [32] Integrated optimization of supplier selection and service scheduling in cloud manufacturing environment
    Lin, Sisi
    Laili, Yuanjun
    Luo, Yongliang
    2018 4TH INTERNATIONAL CONFERENCE ON UNIVERSAL VILLAGE (IEEE UV 2018): HUMANKIND IN HARMONY WITH NATURE THROUGH WISE USE OF TECHNOLOGY, 2018,
  • [33] Supplier selection based on supply chain ecosystem, performance and risk criteria
    Viswanadham, N.
    Samvedi, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (21) : 6484 - 6498
  • [34] The application of fuzzy-ANP in the Selection of Supplier in Supply Chain Management
    Wei, Jin-Yu
    Sun, Ai-Fen
    Wang, Chun-Hui
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1357 - 1360
  • [35] Supplier selection and capacity allocation in medical tourism service supply chain
    Karadayi-Usta, Saliha
    Serdarasan, Seyda
    OPSEARCH, 2024, 61 (04) : 2191 - 2217
  • [36] Development of a supplier selection approach from the viewpoint of the entire supply chain
    Hwang, Ming-Hon
    Rau, Hsin
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 3938 - 3945
  • [37] Genetic Algorithm for Generalized Resource Constrained Multi Project Scheduling Problem Integrated with Closed Loop Supply Chain Planning
    Tayyar, S. Gholizadeh
    Lamothe, J.
    Dupont, L.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1683 - 1687
  • [38] Study on Supplier Selection Model for Supply Chain Collaboration
    Xu, Xing
    Li, Renwang
    Wu, Xinli
    KNOWLEDGE ENGINEERING AND MANAGEMENT, 2011, 123 : 241 - 246
  • [39] Research on supplier selection under supply chain management
    Hu, JL
    He, X
    Duang, S
    THIRD INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE ENGINEERING: DIGITAL ENTERPRISES AND NONTRADITIONAL INDUSTRIALIZATION, 2003, : 373 - 376
  • [40] Supplier selection of cluster supply chain based on flexibility
    Liu Chunling
    Li Jizi
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 1647 - 1651