An Optimised Supplier Selection Plan for Supply Chain Integrated Project Scheduling Problem

被引:6
|
作者
Rahman, Humyun Fuad [1 ]
Chakrabortty, Ripon K. [2 ]
Ryan, Michael J. [1 ]
机构
[1] Univ New South Ales, Capabil Syst Ctr, Sch Engn & Informat Technol, Canberra, ACT, Australia
[2] Univ New South Wales, Sch Engn & Informat Technol, Canberra, ACT, Australia
来源
2019 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON) | 2019年
关键词
Project Scheduling; Supplier Selection; Memetic Algorithm; Supply Chain Cost; Case Study; MATERIAL ORDERING PROBLEM; GENETIC ALGORITHM; CONSTRUCTION; MODEL;
D O I
10.1109/temscon.2019.8813610
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project scheduling (PS) and supply chain management (SCM) are two broad areas that have attracted considerable research attention in recent years. However, the integration of SCM and PS has so far attracted little attention, which motivates this research to include supplier selection strategy in the integrated PS network. Primarily, the project attributes are considered as analogous to the very well-known resource constrained project scheduling problem (RCPSP), which are later integrated with simulated supplier data. After designing mathematical formulations for that integrated model, a genetic algorithm based memetic algorithm (MA) approach is proposed with the objective of minimizing supply chain backward (from supplier to project completion) cost. The proposed algorithm incorporates Nawaz, Enscore, and Ham (NEH) heuristic-based initialization with carefully designed crossover and local search techniques. An online case study model with simulated supplier attributes is considered and solved efficiently to justify the proposed approach. Finally, validation of the proposed MA has been carried out through comparison with a selected state-of-the-art algorithm.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Integrated supplier selection, scheduling, and routing problem for perishable product supply chain: A distributionally robust approach
    Hashemi-Amiri, Omid
    Ghorbani, Fahimeh
    Ji, Ran
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175
  • [2] Integrated order acceptance and supply chain scheduling problem with supplier selection and due date assignment
    Sarvestani, Hossein Khorrami
    Zadeh, Alborz
    Seyfi, Majid
    Rasti-Barzoki, Morteza
    APPLIED SOFT COMPUTING, 2019, 75 : 72 - 83
  • [3] Coordinating supplier selection and project scheduling in resource-constrained construction supply chains
    Chen, Weiwei
    Lei, Lei
    Wang, Zhengwei
    Teng, Mingfei
    Liu, Junming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6512 - 6526
  • [4] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [5] Project portfolio selection and scheduling problem under material supply uncertainty
    Habibi, Farhad
    Chakrabortty, Ripon Kumar
    Servranckx, Tom
    Abbasi, Alireza
    Vanhoucke, Mario
    OPERATIONS MANAGEMENT RESEARCH, 2024,
  • [6] Integrated Methodology for Supplier Selection in Supply Chain Management
    Jain, Naveen
    Singh, A. R.
    Choudhary, A. K.
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 807 - 811
  • [7] An integrated fuzzy-lp approach for a supplier selection problem in supply chain management
    Guneri, Ali Fuat
    Yucel, Atakan
    Ayyildiz, Gokhan
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (05) : 9223 - 9228
  • [8] Supply chain focus dependent supplier selection problem
    Vanteddu, Gangaraju
    Chinnam, Ratna Babu
    Gushikin, Oleg
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 204 - 216
  • [9] An integrated weighted fuzzy multi-objective model for supplier selection and order scheduling in a supply chain
    Bodaghi, Gholamreza
    Jolai, Fariborz
    Rabbani, Masoud
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (10) : 3590 - 3614
  • [10] Improving Supply Chain Performance Through Supplier Selection and Order Allocation Problem
    Wang, Chia-Nan
    Tsou, Ming-Cheng
    Wang, Chih-Hung
    Nguyen, Viet Tinh
    Phuong, Pham Ngo Thi
    CMC-COMPUTERS MATERIALS & CONTINUA, 2022, 70 (01): : 1667 - 1681