A multi-objective approach to the application of real-world production scheduling

被引:14
作者
Korosec, Peter [1 ]
Bole, Uros [2 ]
Papa, Gregor [1 ,2 ]
机构
[1] Jozef Stefan Inst, Comp Syst Dept, Ljubljana, Slovenia
[2] Jozef Stefan Int Postgrad Sch, Ljubljana, Slovenia
关键词
Combinatorial optimization; Decision support systems; Flexibility; Job shop scheduling; Multicriteria; MEMETIC ALGORITHMS; LOCAL SEARCH; DECISION-SUPPORT; JOB SHOPS; OPTIMIZATION; PARETO; TIME;
D O I
10.1016/j.eswa.2013.05.035
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
An initiative was introduced in one of the production facilities of Germany's E.G.O. Group in order to enhance its SAP information system with a custom-made application for production-scheduling optimization. The goal of the optimization is to find a production schedule that satisfies different, contradictory production and business constraints. We show the challenges faced in the application of the multi-objective optimization approach, which is gaining influence in the management of production scheduling. We implement a memetic version of the Indicator-Based Evolutionary Algorithm with customized reproduction operators and local search procedures to find a set of feasible, non-dominated solutions. Such a memetic algorithm was applied to two real order lists from the production company. Additionally, we also lay out an efficient presentation of the multi-objective results for an expert's support in decision making. This provides the management with the possibility to gain additional insights into how the production schedule dynamically reacts to changes in the decision criteria. We show that the multi-objective approach is able to find high-quality solutions, which enables flexibility when it comes to quickly adapting to specific business conditions. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:5839 / 5853
页数:15
相关论文
共 39 条
  • [1] [Anonymous], 2001, P 5 C EVOLUTIONARY M
  • [2] [Anonymous], 2004, NONLINEAR OPTICS TEL, DOI DOI 10.1007/978-3-662-08996-5
  • [3] Back T., 2000, EVOLUTIONARY COMPUTA
  • [4] Indicator-based multi-objective local search
    Basseur, M.
    Burke, E. K.
    [J]. 2007 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-10, PROCEEDINGS, 2007, : 3100 - 3107
  • [5] Bole U., 2011, P 15 PORT C ART INT, P535
  • [6] Sequence-dependent group scheduling problem on unrelated-parallel machines
    Bozorgirad, Mir Abbas
    Logendran, Rasaratnam
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (10) : 9021 - 9030
  • [7] A memetic algorithm for the job-shop with time-lags
    Caumond, Anthony
    Lacomme, Philippe
    TcherneVa, Nikolay
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (07) : 2331 - 2356
  • [8] A decision support system for production scheduling in an ion plating cell
    Chan, FTS
    Au, KC
    Chan, PLY
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2006, 30 (04) : 727 - 738
  • [9] Multiobjective memetic algorithms for time and space assembly line balancing
    Chica, Manuel
    Cordon, Oscar
    Damas, Sergio
    Bautista, Joaquin
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (02) : 254 - 273
  • [10] Dynamic scheduling of manufacturing job shops using genetic algorithms
    Chryssolouris, G
    Subramaniam, V
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2001, 12 (03) : 281 - 293