Robust flow shop scheduling with random processing times for reduction of peak power consumption

被引:21
作者
Nagasawa, Keisuke [1 ]
Ikeda, Yuto [2 ]
Irohara, Takashi [2 ]
机构
[1] Hiroshima Univ, Div Elect Syst & Math Engn, Fac Engn, Higashihiroshima 7398527, Japan
[2] Sophia Univ, Dept Informat & Commun Sci, Chiyoda Ku, Tokyo 1028554, Japan
关键词
Flow shop scheduling; Peak power; Random processing time; Simulation; PARALLEL MACHINES; ENERGY-CONSUMPTION; SETUP TIMES; JOBS; ALGORITHM; SYSTEM;
D O I
10.1016/j.simpat.2015.08.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Recently, power shortages have become a major problem all over Japan, due to the Great East Japan Earthquake, which resulted in the shutdown of a nuclear power plant. As a consequence, production scheduling has become a problem for factories, due to considerations of the availability of electric power. For factories, the contract with the electric power company sets the maximum power demand for a unit period, and in order to minimize this, it is necessary to consider the peak power when scheduling production. There are conventional studies on flowshop scheduling with consideration of peak power. However, these studies did not consider fluctuations in the processing time. Because the actual processing time is not constant, there is an increase in the probability of simultaneous operations with multiple machines. If the probability of simultaneous operations is high, the probability of increasing the peak power is high. Thus, we consider inserting idle time (delay in inputting parts) into the schedule in order to reduce the likelihood of simultaneous operations. We consider a robust schedule that limits the peak power, in spite of an unexpected fluctuation in the processing time. However, when we insert idle time, the makespan gets longer, and the production efficiency decreases. Therefore, we performed simulations to investigate the optimal amount of idle time and the best point for inserting it. We propose a more robust production scheduling model that considers random processing times and the peak power consumption. The results of experiments show that the effectiveness of the schedule produced by the proposed method is superior to the initial schedule and to a schedule produced by another method. Thus, the use of random processing times can limit the peak power. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:102 / 113
页数:12
相关论文
共 50 条
[41]   Modified Estimation of Distribution Algorithm for Solving Flow-shop Scheduling Problem with Setup Times [J].
Feng, Mengxuan ;
Kong, Jianshou ;
Liu, Lingyan ;
Liu, Guodong ;
Zhao, Shanshan ;
Zhang, Yue .
2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, :4041-4046
[42]   Efficient scheduling of a stochastic no-wait job shop with controllable processing times [J].
Aschauer, Alexander ;
Roetzer, Florian ;
Steinboeck, Andreas ;
Kugi, Andreas .
EXPERT SYSTEMS WITH APPLICATIONS, 2020, 162
[43]   Multi-stage hybrid flow shop scheduling problem with lag, unloading, and transportation times [J].
Hidri, Lotfi ;
Tlija, Mehdi .
PEERJ COMPUTER SCIENCE, 2024, 10
[44]   The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times [J].
Shabtay, Dvir ;
Kaspi, Moshe ;
Steiner, George .
IIE TRANSACTIONS, 2007, 39 (05) :539-557
[45]   A MODEL AND ALGORITHM FOR SCHEDULING IN A REAL-LIFE FLOW SHOP WITH SETUP TIMES [J].
Yang, Kaibing ;
Liu, Xiaobing .
ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, :177-181
[46]   Metaheuristics for a Flow Shop Scheduling Problem with Urgent Jobs and Limited Waiting Times [J].
Jeong, BongJoo ;
Han, Jun-Hee ;
Lee, Ju-Yong .
ALGORITHMS, 2021, 14 (11)
[47]   A BIASED-RANDOMIZED SIMHEURISTIC FOR A HYBRID FLOW SHOP WITH STOCHASTIC PROCESSING TIMES IN THE SEMICONDUCTOR INDUSTRY [J].
Ammouriova, Majsa ;
Panadero, Javier ;
Leissau, Madlene ;
Laroque, Christoph ;
Schumacher, Christin ;
Juan, Angel A. .
2022 WINTER SIMULATION CONFERENCE (WSC), 2022, :1888-1898
[48]   A decomposition approach to job-shop scheduling problem with discretely controllable processing times [J].
Niu GangGang ;
Sun ShuDong ;
Lafon, Pascal ;
Yang HongAn .
SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2011, 54 (05) :1240-1248
[49]   Automated job shop scheduling with dynamic processing times and due dates using project management and industry 4.0 [J].
Kianpour, Parsa ;
Gupta, Deepak ;
Krishnan, Krishna Kumar ;
Gopalakrishnan, Bhaskaran .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (07) :485-498
[50]   Flexible job-shop scheduling problem with the number of workers dependent processing times [J].
Tutumlu, Busra ;
Sarac, Tugba .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2025, 16 (02) :357-370