Robust flow shop scheduling with random processing times for reduction of peak power consumption

被引:23
作者
Nagasawa, Keisuke [1 ]
Ikeda, Yuto [2 ]
Irohara, Takashi [2 ]
机构
[1] Hiroshima Univ, Div Elect Syst & Math Engn, Fac Engn, Higashihiroshima 7398527, Japan
[2] Sophia Univ, Dept Informat & Commun Sci, Chiyoda Ku, Tokyo 1028554, Japan
关键词
Flow shop scheduling; Peak power; Random processing time; Simulation; PARALLEL MACHINES; ENERGY-CONSUMPTION; SETUP TIMES; JOBS; ALGORITHM; SYSTEM;
D O I
10.1016/j.simpat.2015.08.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Recently, power shortages have become a major problem all over Japan, due to the Great East Japan Earthquake, which resulted in the shutdown of a nuclear power plant. As a consequence, production scheduling has become a problem for factories, due to considerations of the availability of electric power. For factories, the contract with the electric power company sets the maximum power demand for a unit period, and in order to minimize this, it is necessary to consider the peak power when scheduling production. There are conventional studies on flowshop scheduling with consideration of peak power. However, these studies did not consider fluctuations in the processing time. Because the actual processing time is not constant, there is an increase in the probability of simultaneous operations with multiple machines. If the probability of simultaneous operations is high, the probability of increasing the peak power is high. Thus, we consider inserting idle time (delay in inputting parts) into the schedule in order to reduce the likelihood of simultaneous operations. We consider a robust schedule that limits the peak power, in spite of an unexpected fluctuation in the processing time. However, when we insert idle time, the makespan gets longer, and the production efficiency decreases. Therefore, we performed simulations to investigate the optimal amount of idle time and the best point for inserting it. We propose a more robust production scheduling model that considers random processing times and the peak power consumption. The results of experiments show that the effectiveness of the schedule produced by the proposed method is superior to the initial schedule and to a schedule produced by another method. Thus, the use of random processing times can limit the peak power. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:102 / 113
页数:12
相关论文
共 50 条
[31]   AN APPROXIMATION ALGORITHM FOR THE M-MACHINE PERMUTATION FLOW-SHOP SCHEDULING PROBLEM WITH CONTROLLABLE PROCESSING TIMES [J].
NOWICKI, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :342-349
[32]   A Genetic Regulatory Network-Based Method for Dynamic Hybrid Flow Shop Scheduling with Uncertain Processing Times [J].
Lv, Youlong ;
Zhang, Jie ;
Qin, Wei .
APPLIED SCIENCES-BASEL, 2017, 7 (01)
[33]   Evolutionary algorithm for stochastic job shop scheduling with random processing time [J].
Horng, Shih-Cheng ;
Lin, Shieh-Shing ;
Yang, Feng-Yi .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) :3603-3610
[34]   A variant of the permutation flow shop model with variable processing times [J].
Finke, G ;
Jiang, H .
DISCRETE APPLIED MATHEMATICS, 1997, 76 (1-3) :123-140
[35]   A robust just-in-time flow shop scheduling problem with outsourcing option on subcontractors [J].
Goli, Alireza ;
Tirkolaee, Erfan Babaee ;
Soltani, Mehdi .
PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2019, 7 (01) :294-315
[36]   Flow shop batching and scheduling with sequence-dependent setup times [J].
Shen, Liji ;
Gupta, Jatinder N. D. ;
Buscher, Udo .
JOURNAL OF SCHEDULING, 2014, 17 (04) :353-370
[37]   Whale Optimization Algorithm for Flexible Flow Shop Scheduling with Setup Times [J].
Meng Fu ;
Han Zhonghua ;
Gao Zhijun ;
Dong Xiaoting ;
Tian Xutian .
2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, :157-162
[38]   Flow shop batching and scheduling with sequence-dependent setup times [J].
Liji Shen ;
Jatinder N. D. Gupta ;
Udo Buscher .
Journal of Scheduling, 2014, 17 :353-370
[39]   Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem [J].
Varmazyar, Mohsen ;
Salmasi, Nasser .
MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 :4063-4069
[40]   A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size [J].
Danneberg, D ;
Tautenhahn, T ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 1999, 29 (09) :101-126