Airport Operation Situation Risk Assessment: Combination Method Based on FAHP and Fine Kinney

被引:0
作者
Zhang, Xintai [1 ]
Xing, Xiaoqing [2 ]
Xie, Yanwen [1 ]
Zhang, Yaping [1 ]
Xing, Zhiwei [3 ]
Luo, Xiao [4 ]
机构
[1] Harbin Inst Technol, Sch Transportat Sci & Engn, POB 150000,ST Huanghe Rd 73, Harbin, Peoples R China
[2] Aviat Flight Univ China, Sch Aviat Engn, POB 618307,ST Nanchang Rd 46, Guanghan, Peoples R China
[3] Civil Aviat Univ China, Res Base Ground Support Equipment, POB 300000,ST Jinbei Rd 2898, Tianjin, Peoples R China
[4] Civil Aviat Adm China, Inst 2, POB 610000,ST Erhuan Rd 17, Chengdu, Peoples R China
来源
PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019) | 2019年
基金
中国国家自然科学基金;
关键词
operation situation assessment; hierarchical quantization; risk assessment; AWARENESS;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
This paper introduces a combination method for airport operation situation risk assessment. In order to quantify the key influencing factors of airport operation situation and improve the airport operation efficiency and service capacity, we attempt to develop a model of situation value for airport operation situation. Ten indexes are selected as the key influencing factors of airport operation situation from three aspects: flight guarantee, airport core resource utilization efficiency, and take-off and landing efficiency. Airport operation situation is layered. We propose a method named FAHP to determine the weight of each level and a combination method based on FAHP and Fine Kinney to assess the risk of the ten indexes. Taking Xinzheng Airport as an example, independent t-test and Levene-test are carried out on the evaluation results. The results suggest that the combination of FAHP and Fine Kinney has certain generalization. The research results can be applied to risk assessment of airport operation situation and provide decision-making basis for civil aviation departments.
引用
收藏
页码:436 / 447
页数:12
相关论文
共 50 条
  • [41] Operation Risk Assessment of AC/DC Hybrid Distribution System Based on Two-Point Estimation Method
    Xiao, Hao
    Pei, Wei
    Kong, Li
    2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2018, : 384 - 388
  • [42] Risk Assessment Method of Drainage Network Operation Based on Fuzzy Comprehensive Evaluation Combined with Analytic Network Process
    Ba, Zhenning
    Fu, Jisai
    Liang, Jianwen
    Liang, Kai
    Wang, Mingshuo
    JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2021, 12 (02)
  • [43] A Risk Assessment Method based on Software Behavior
    Chen, Guorong
    Wang, Kun
    Tan, Jian
    Li, Xiaoyong
    2019 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENCE AND SECURITY INFORMATICS (ISI), 2019, : 47 - 52
  • [44] Risk assessment method based on fuzzy logic
    Zhao, Yuan
    Jiao, Jian
    Zhao, Ting-Di
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2015, 37 (08): : 1825 - 1831
  • [45] An Information System Risk Assessment Method Based on Risk Propagation
    Yang H.-Y.
    Zhang L.
    Zhang L.
    Beijing Youdian Daxue Xuebao/Journal of Beijing University of Posts and Telecommunications, 2021, 44 (04): : 41 - 48
  • [46] RESEARCH ON THE SAFETY RISK ASSESSMENT METHOD OF TUBE-RAIL OPERATION SYSTEM
    Zhang, Huai-Jing
    Wang, Xi
    Wang, Yan-Hui
    Gao, Yongtao
    Zhang, Xiu-Yun
    4TH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER THEORY AND ENGINEERING ( ICACTE 2011), 2011, : 89 - 94
  • [47] A risk evaluation method for human-machine interaction in emergencies based on multiple mental models-driven situation assessment
    Guo, Jianbin
    Ma, Shuo
    Zeng, Shengkui
    Che, Haiyang
    Pan, Xing
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 252
  • [48] Project logistics risk assessment based on the fuzzy comprehensive assessment method
    Jun, Zhang
    TENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I AND II, 2011, : 1008 - 1012
  • [49] Risk assessment of contractor support based on improved risk matrix method
    Zhang F.-Y.
    Li D.-Y.
    Geng B.
    Liu Z.-L.
    Journal of Shanghai Jiaotong University (Science), 2015, 20 (04) : 464 - 467
  • [50] Risk Assessment of Contractor Support Based on Improved Risk Matrix Method
    张福元
    李东阳
    耿斌
    刘占岭
    Journal of Shanghai Jiaotong University(Science), 2015, 20 (04) : 464 - 467