Fuzzy Logic Analysis of the Build, Capacity Build and Transfer (B-CB-T) Modality for Urban Water Supply Service Delivery in Ethiopia

被引:6
作者
Godfrey, Samuel [1 ]
Asmare, Getachew [2 ]
Gossa, Tamene [2 ]
Paba, Michele [3 ]
机构
[1] UNON, UNICEF, POB 44145-00100, Nairobi, Kenya
[2] Water Supply & Sanitat Sect, POB 1169, Addis Ababa, Ethiopia
[3] Water Supply & Sanitat Sect, POB 30375, Lilongwe, Malawi
关键词
build; capacity build and transfer (B-CB-T); BOT; risk factors; fuzzy logic approach; urban water supply; civil engineering contract; procurement; sustainability; RISK-ASSESSMENT METHODOLOGY; CONSTRUCTION RISK; BUSINESS FAILURE;
D O I
10.3390/w11050979
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Rapid urbanization in Ethiopia is resulting in the need for alternative sustainable service models for urban water supply. Contractual arrangements to improve the functionality of urban water services in Ethiopia have included build, operate and transfer (BOT), design, build and operate (DBO), performance-based contracts (PBC) and utility development. UNICEF undertook a review of these modalities and concluded that a modified version of the BOT modality was required to both incentivize private sector engagement in urban water supply and to enhance public sector utilities. This paper describes the contractual modality developed to achieve this aim, namely an Ethiopian build, capacity build and transfer (B-CB-T) modality. This paper tests the applicability of the B-CB-T model using fuzzy logic statistical analysis and concludes that of the four tested variables (internal accountability, external accountability, operation and maintenance and financial management), the most statistically significant was the clear mandate to address complaints and maintain a positive relationship with the clients (users). This paper concludes that the B-CB-T is an effective contracting modality that should be accompanied by appropriate behavior change and social mobilization outreach to maximize tariff, billing, extension and performance of the infrastructure that is administered within the B-CB-T arrangement.
引用
收藏
页数:8
相关论文
共 32 条
[1]  
Akbiyikli R., 2004, COMPARISON PFI BOT B, P506
[2]   RISK MANAGEMENT FRAMEWORK FOR BUILD, OPERATE AND TRANSFER (BOT) PROJECTS IN KUWAIT [J].
Al-Azemi, Khalid Fahad ;
Bhamra, Ran ;
Salman, Ahmed F. M. .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (03) :415-433
[3]  
[Anonymous], 1995, PRIVATIZED INFRASTRU
[4]  
[Anonymous], 2014, World Urbanization Prospects 2014: Highlights
[5]  
Beall J., 2006, URBAN POVERTY DEV 21
[6]   A risk assessment methodology for incorporating uncertainties using fuzzy concepts [J].
Cho, HN ;
Choi, HH ;
Kim, YB .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 78 (02) :173-183
[7]   Risk assessment methodology for underground construction projects [J].
Choi, HH ;
Cho, HN ;
Seo, JW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) :258-272
[8]  
Confoy B., 1999, CIB W92 CIB TG 23 JO
[9]   Using analytic network process to assess business failure risks of construction firms [J].
Dikmen, Irem ;
Birgonul, M. ;
Ozorhon, Beliz ;
Sapci, Nurdan .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2010, 17 (04) :369-+
[10]   Urbanization in Africa: challenges and opportunities for conservation [J].
Guneralp, Burak ;
Lwasa, Shuaib ;
Masundire, Hillary ;
Parnell, Susan ;
Seto, Karen C. .
ENVIRONMENTAL RESEARCH LETTERS, 2018, 13 (01)