Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families

被引:14
|
作者
Li, XiaoLin [1 ]
Li, YuPeng [1 ]
Huang, YanLi [1 ]
机构
[1] China Univ Min & Technol, Sch Mines, Key Lab Deep Coal Resource Min, Minist Educ China, Xuzhou 221116, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Batch processing machine; Heuristics; Maximum lateness; Lower bound; Job families; SCHEDULING PROBLEM; WEIGHTED NUMBER; ALGORITHMS; MAKESPAN; SIZES;
D O I
10.1016/j.cor.2019.02.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Production efficiency can be greatly improved by using batch processing machines which can process several jobs in parallel. When job processing characteristics are different, job family should be further considered to group jobs properly in a batch. The problem of scheduling non-identical jobs from incompatible job families on a batch processing machine is investigated in this paper. Job sizes are non-identical and the objective is to minimize the maximum lateness L-max. Batch processing time is determined by the job with the longest processing time and batch due date equals to the earliest job due date in the batch. Only jobs from the same job family can be grouped together in the same batch. A mathematical model of the problem under study is formulated and validated by using CPLEX. A lower bound is proposed based on the lower bound and the upper bound of the batch number. Because of the NP-hardness of the problem, heuristics are designed to solve the problem under study. These heuristics are then improved by optimizing completion time or due date of the critical batch. Experimental studies show that heuristics could be effectively improved by CTD (Completion Time Decreasing) rules. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:91 / 101
页数:11
相关论文
共 50 条
  • [31] Fuzzy Resource Allocation Problem for Minimizing Maximum Lateness on a Single Machine
    Harikrishnan, Kanthen K.
    Ishii, Hiroaki
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2006, 5 (02): : 97 - 101
  • [32] More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
    Aydilek, Harun
    Aydilek, Asiye
    Allahverdi, Muberra
    Allahverdi, Ali
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2022, 13 (04) : 543 - 556
  • [33] Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
    Lin, BMT
    Jeng, AAK
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 91 (02) : 121 - 134
  • [34] A bi-objective evolutionary algorithm for minimizing maximum lateness and total pollution cost on non-identical parallel batch processing machines
    Li, Kai
    Zhang, Han
    Chu, Chengbin
    Jia, Zhao-hong
    Wang, Yan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 172
  • [35] Control of a Single Batch Processor with Incompatible Job Families and Future Job Arrivals
    Tajan, John Benedict C.
    Sivakumar, Appa Iyer
    Gershwin, Stanley B.
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2011, 24 (02) : 208 - 222
  • [36] Minimising makespan on a batch processing machine using heuristics improved by an enumeration scheme
    Li, XiaoLin
    Li, YuPeng
    Wang, Yu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (01) : 176 - 186
  • [37] Effective league championship algorithm and lower bound procedure for scheduling a single batch-processing machine with non-identical job sizes and job rejection
    Afkhami, Saeed
    Kashan, Ali Husseinzadeh
    Ostadi, Bakhtiar
    RAIRO-OPERATIONS RESEARCH, 2023, 57 (03) : 1453 - 1479
  • [38] SCHEDULING ALGORITHMS FOR JOB SHOPS WITH JOB FAMILIES: MINIMIZING THE SUM OF THE MAXIMUM FAMILY FLOW TIMES
    Yu, Jaemin
    Lee, Dongho
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 1935 - 1941
  • [39] Scheduling algorithms for heterogeneous batch processors with incompatible job-families
    M. Mathirajan
    A. I. Sivakumar
    V. Chandru
    Journal of Intelligent Manufacturing, 2004, 15 : 787 - 803
  • [40] Scheduling algorithms for heterogeneous batch processors with incompatible job-families
    Mathirajan, M
    Sivakumar, AI
    Chandru, V
    JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (06) : 787 - 803