A simple and effective evolutionary algorithm for multiobjective flexible job shop scheduling

被引:105
作者
Chiang, Tsung-Che [1 ]
Lin, Hsiao-Jou [1 ]
机构
[1] Natl Taiwan Normal Univ, Dept Comp Sci & Informat Engn, Taipei, Taiwan
关键词
Flexible job shop scheduling; Multiobjective optimization; Pareto optimal; Evolutionary algorithm; GENETIC ALGORITHM; SEARCH ALGORITHM; DISPATCHING RULES; TABU SEARCH; HYBRID; OPTIMIZATION;
D O I
10.1016/j.ijpe.2012.03.034
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the multiobjective flexible job shop scheduling problem (MOFJSP) regarding minimizing the makespan, total workload, and maximum workload. The problem is solved in a Pareto manner, whose goal is to seek for the set of Pareto optimal solutions. We propose a multiobjective evolutionary algorithm, which utilizes effective genetic operators and maintains population diversity carefully. A main feature of the proposed algorithm is its simplicity-it needs only two parameters. Performance of our algorithm is compared with seven state-of-the-art algorithms on fifteen popular benchmark instances. Only our algorithm can find 70% or more non-dominated solutions for every instance. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:87 / 98
页数:12
相关论文
共 46 条
[41]   Flexible job-shop scheduling with parallel variable neighborhood search algorithm [J].
Yazdani, M. ;
Amiri, M. ;
Zandieh, M. .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (01) :678-687
[42]   An effective genetic algorithm for the flexible job-shop scheduling problem [J].
Zhang, Guohui ;
Gao, Liang ;
Shi, Yang .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) :3563-3573
[43]   An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem [J].
Zhang, Guohui ;
Shao, Xinyu ;
Li, Peigen ;
Gao, Liang .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) :1309-1318
[44]   Multiobjective evolutionary algorithms: A comparative case study and the Strength Pareto approach [J].
Zitzler, E ;
Thiele, L .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 1999, 3 (04) :257-271
[45]  
Zitzler E., 2002, P C EVOLUTIONARY COM, P19
[46]   Minimizing the makespan for the MPM job-shop with availability constraints [J].
Zribi, N. ;
El Kamel, A. ;
Borne, P. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) :151-160