Research of Power System Maintenance Decision-making Based on the Maintaining Equipment Set

被引:0
作者
Ni, Guangkui [1 ]
Qi, Yanfang [1 ]
Wang, Zhitao [1 ]
Zhang, Shiliang [2 ]
机构
[1] State Grid Laiwu Elect Power Co, Laiwu, Peoples R China
[2] Shandong Ruichuang Elect Power Technol Co LTD, Jinan, Shandong, Peoples R China
来源
2017 CHINESE AUTOMATION CONGRESS (CAC) | 2017年
关键词
equipment importance; reliability tracing; state maintenance; maintaining equipment set;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Electrical equipment reliability model and maintaining equipment set choice are the fundamental of power system risk evaluation. Based on the online monitoring, electrical equipment reliability model is more and more detailed and accurate. However, the research about the maintaining equipment set choice is rough. At present, the decision about the maintaining equipment set choice is converted into the equipment importance assessment model. Different equipment assessment models qualitatively analyze the equipments effects on the system risk from different views. However, they lack the quantitative analysis of system risk. System reliability tracing model realizes the quantitative analysis of electrical equipments' reliability parameters effects on system risk, which avoids equipments importance assessment model' disadvantages. Based on the detailed research of the equipment importance assessment model and system reliability tracing model, unified the state maintenance model, a determined maintenance schedule is developed. The Case study indicated that the proposed technique for determination can improve the efficiency of maintenance effectively and improve system's reliability and economy.
引用
收藏
页码:6038 / 6043
页数:6
相关论文
共 14 条
[1]  
[邓彬 Deng Bin], 2013, [电网技术, Power System Technology], V37, P3489
[2]  
Dong Yu-liang, 2003, Proceedings of the CSEE, V23, P201
[3]  
Gi Juoqiang, 2013, Proceedings of the CSEE, V33, P139
[4]  
Hu Bo, 2010, Proceedings of the CSEE, V30, P29
[5]  
Li Ming, 2011, Proceedings of the CSEE, V31, P43
[6]  
SHEN Xue, 2014, SHANXI ELECT POWER, V42, P77
[7]  
State Grid Corporation of China, 2008, Q GDW 168 2008 REG C
[8]   Tracing the component unreliability contributions and recognizing the weak parts of a bulk power system [J].
Xie, Kaigui ;
Hu, Bo ;
Karki, Rajesh .
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2011, 21 (01) :254-262
[9]   Tracing the unreliability and recognizing the major unreliability contribution of network components [J].
Xie, Kaigui ;
Billinton, Roy .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (05) :927-931
[10]   Overhead Line Preventive Maintenance Strategy Based on Condition Monitoring and System Reliability Assessment [J].
Zhang, Dabo ;
Li, Wenyuan ;
Xiong, Xiaofu .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) :1839-1846