Implications of production and capacity planning functions: Impact analysis

被引:0
作者
Pandey, PC
Hasin, MAA
机构
关键词
capacity planning; flexibility; inventory holding time; production planning;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Production planning and capacity planning are considered to be individual planning sub-functions for executing production plans within capacity. Several attempts have been taken to integrate these two planning sub-functions without consideration of their impacts on each other. Production planning and management elements, like worker flexibility and machine flexibility, have an impact on capacity planning. Capacity planning elements, like overtime and undertime, also have a significant impact on some elements of production planning, like inventory holding costs, manufacturing leadtime, etc., and vice versa. This paper aims to analyse and formulate those impacts.
引用
收藏
页码:119 / 125
页数:7
相关论文
共 22 条
[1]  
AGGARWAL SC, 1985, HARVARD BUSINESS SEP, P8
[2]  
ARNOLD JRT, 1991, INTRO MAT MANAGEMENT, P75
[3]  
BROWNE J, 1988, PRODUCTION MANAGEMEN, P93
[4]  
*C WAY SYST INC, 1989, PRS PROD RES SYST
[6]  
HANCOCK TM, 1988, P INT C COMP INT MAN, P138
[7]  
HARHALAKIS G, 1992, J MANUF SYST, V9, P116
[8]  
HASIN MAA, 1995, P 1 AS AC MAN AAM C
[9]  
KAMENETZKY RD, 1985, IND ENG OCT, P44
[10]   CIM PROGRESS IN A KOREAN HEAVY-INDUSTRY COMPANY [J].
KIM, SY ;
KIM, HI ;
KANG, WI ;
LEE, HK .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (4-5) :201-209