The coupled unit-time operations problem on identical parallel machines with respect to the makespan

被引:0
作者
Munier-Kordon, Alix [1 ]
Rebaine, Djamal [2 ]
机构
[1] Univ Paris 06, Dept SOC, Lab LIP6, F-75252 Paris 05, France
[2] Univ Quebec Chicoutimi, Dept Informat & Math, Chicoutimi, PQ G7H 2B1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Coupled operations; Makespan; Special case; Time delays; Worst-case analysis; TASKS;
D O I
10.1016/j.orl.2013.11.006
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the problem of scheduling n unit-time coupled operations on m identical parallel machines with minimum time delay considerations so as to minimize the overall completion time, known as the makespan. Two approximation algorithms, along with their worst-case analysis, are presented. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:21 / 26
页数:6
相关论文
共 11 条
[11]   Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard [J].
Yu, WC ;
Hoogeveen, H ;
Lenstra, JK .
JOURNAL OF SCHEDULING, 2004, 7 (05) :333-348