Genetic algorithm-based multi-criteria project portfolio selection

被引:90
作者
Yu, Lean [1 ]
Wang, Shouyang [1 ]
Wen, Fenghua [2 ]
Lai, Kin Keung [3 ]
机构
[1] Chinese Acad Sci, Acad Math & Syst Sci, Inst Syst Sci, MADIS, Beijing 100190, Peoples R China
[2] Changsha Univ Sci & Technol, Sch Econ & Management, Res Ctr Financial Engn & Financial Management, Changsha 410114, Hunan, Peoples R China
[3] City Univ Hong Kong, Dept Management Sci, Kowloon, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Multi-criteria decision making; Nonlinear integer programming; Genetic algorithm; Project portfolio selection; Project interactions; Preference; CRITERIA DECISION-MAKING; SUPPORT-SYSTEM; MODEL; MANAGEMENT;
D O I
10.1007/s10479-010-0819-6
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Project portfolio selection is one of the most important decision-making problems for most organizations in project management and engineering management. Usually project portfolio decisions are very complicated when project interactions in terms of multiple selection criteria and preference information of decision makers (DMs) in terms of the criteria importance are taken into consideration simultaneously. In order to solve this complex decision-making problem, a multi-criteria project portfolio selection problem considering project interactions in terms of multiple selection criteria and DMs' preferences is first formulated. Then a genetic algorithm (GA)-based nonlinear integer programming (NIP) approach is used to solve the multi-criteria project portfolio selection problem. Finally, two illustrative examples are presented for demonstration and verification purposes. Experimental results obtained indicate that the GA-based NIP approach can be used as a feasible and effective solution to multi-criteria project portfolio selection problems.
引用
收藏
页码:71 / 86
页数:16
相关论文
共 37 条
[1]   MODEL FOR SELECTION OF INTERDEPENDENT R AND D PROJECTS [J].
AAKER, DA ;
TYEBJEE, TT .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1978, 25 (02) :30-36
[2]   Fuzzy portfolio selection using genetic algorithm [J].
Abiyev, Rahib H. ;
Menekay, Mustafa .
SOFT COMPUTING, 2007, 11 (12) :1157-1163
[3]  
[Anonymous], 2006, SPRINGERS INT SERIES
[4]   Pseudo-Boolean optimization [J].
Boros, E ;
Hammer, PL .
DISCRETE APPLIED MATHEMATICS, 2002, 123 (1-3) :155-225
[5]   MULTIPLE CRITERIA DECISION-MAKING - THE CASE FOR INTERDEPENDENCE [J].
CARLSSON, C ;
FULLER, R .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (03) :251-260
[6]   AN IMPROVED DISCRETE DYNAMIC-PROGRAMMING ALGORITHM FOR ALLOCATING RESOURCES AMONG INTERDEPENDENT PROJECTS [J].
CARRAWAY, RL ;
SCHMIDT, RL .
MANAGEMENT SCIENCE, 1991, 37 (09) :1195-1200
[7]   New product portfolio management: Practices and performance [J].
Cooper, RG ;
Edgett, SJ ;
Kleinschmidt, EJ .
JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 1999, 16 (04) :333-351
[8]   INTERACTION [J].
COX, DR ;
ATKINSON, AC ;
BOX, GEP ;
DARROCH, JN ;
SPJOTVOLL, E ;
WAHRENDORF, J .
INTERNATIONAL STATISTICAL REVIEW, 1984, 52 (01) :1-31
[9]   Technology portfolio management: Optimizing interdependent projects over multiple time periods [J].
Dickinson, MW ;
Thornton, AC ;
Graves, S .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2001, 48 (04) :518-527
[10]  
Ewing P.L., 2006, DECIS ANAL, V3, P33, DOI [https://doi.org/10.1287/deca.1060.0062, DOI 10.1287/DECA.1060.0062]