Many problems result when coal mine shafts are built in complicated geological conditions and serious shaft lining ruptures have often occurred in the eastern part of China since 1987. Several types of treatment methods were used for shaft lining reinforcement such as grouting method, sets of wall reinforcement method and stress-relief slot method; based on an analysis of these methods and the mechanism of the shaft lining rupture, a new treatment method was proposed for shaft lining treatment with underground continuous impervious curtain. In this research, the various conditions of the UCIC built around the shaft lining were analyzed, and the effect of the (UCIC) range of improvement was discussed, then the optimum condition was determined. The results show that the effect of the UCIC for treatment depends on the range and width and also the material's property, the safety factor of the shaft lining can be the evaluation criterion and had great changes in the boundary of the different layers.
机构:
School of Resources and Geosciences, China University of Mining and Technology, XuzhouSchool of Resources and Geosciences, China University of Mining and Technology, Xuzhou
Yu Q.
Ma J.
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, XuzhouSchool of Resources and Geosciences, China University of Mining and Technology, Xuzhou
机构:
China Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R China
Jiangsu Res & Dev Ctr Construct Safety & Disaster, Xuzhou 221116, Peoples R ChinaChina Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R China
Tao Xiangling
Ma Jinrong
论文数: 0引用数: 0
h-index: 0
机构:
China Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R ChinaChina Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R China
Ma Jinrong
Wei, Zeng
论文数: 0引用数: 0
h-index: 0
机构:
China Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R ChinaChina Univ Min & Technol, State Key Lab Geomechan & Deep Underground Engn, Xuzhou 221116, Peoples R China
机构:
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
Jiangsu Research & Development Centre of Construction Safety and Disaster MitigationState Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
Tao Xiangling
Ma Jinrong
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and TechnologyState Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
Ma Jinrong
Zeng Wei
论文数: 0引用数: 0
h-index: 0
机构:
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and TechnologyState Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology
机构:
Indian Inst Technol Kharagpur, Dept Min Engn, Kharagpur, W Bengal, IndiaIndian Inst Technol Kharagpur, Dept Min Engn, Kharagpur, W Bengal, India
Bhattacherjee, Ashis
Chau, Nearkasen
论文数: 0引用数: 0
h-index: 0
机构:
Natl Inst Hlth & Med Res Inserm, U1178, Paris, France
Univ Paris Sud, Paris, France
Univ Paris 05, UMR S1178, Paris, FranceIndian Inst Technol Kharagpur, Dept Min Engn, Kharagpur, W Bengal, India