STATUS OF DESIGN AND R&D FOR ITER BLANKET IN KOREA

被引:3
作者
Kim, Duck-Hoi [1 ]
Kim, Suk-Kwon [2 ]
Kim, Sawoong [1 ]
Lee, Dong-Won [2 ]
Jung, Hun-Chea [1 ]
Ahn, Hee-Jae [1 ]
Lee, Hyeon Gon [1 ]
Jung, Ki-Jung [1 ]
机构
[1] Natl Fus Res Inst, Taejon 305333, South Korea
[2] Korea Atom Energy Res Inst, Taejon 305353, South Korea
关键词
HEAT-FLUX TEST; MOCKUPS; QUALIFICATION; FABRICATION;
D O I
10.13182/FST13-A18066
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Since the decision of blanket redesign by 2007 ITER design review, the blanket system is being developed in the framework of Blanket Integrated Product Team (BIPT) composed mainly of ITER Organization (IO) and procuring parties. Korean Domestic Agency (KODA) is mainly contributing to the design and development of blanket Shield Block (SB). In particular, KODA is supporting the design activities including electromagnetic, thermo-hydraulic and thermo-mechanical analyses to complete the final design of blanket shield block. For the manufacturing of a blanket shield block conventional fabrication techniques based on drilling, milling and welding of stainless steel forged blocks have been adopted As a consequence of the manufacturing feasibility study, key fabrication techniques to be verified beforehand have been identified and successfully developed in collaboration with related industries. The pre-qualification program of the fabrication and testing of Full Scale Prototype (FSP) is in progress. Until now the material development of 316L(N)-IG stainless steel forging has been successfully completed, and the fabrication of FSP is on-going. Even though the procurement of blanket First Wall (FW) was withdrawn at the 96 meeting of the ITER Management Advisory Committee, the participation of the 2nd pre-qualification program of EHF (Enhanced Heat Flux) FW small scale mock is being valid for securing core engineering technologies. At present the fabricated mock-ups are waiting for high heat flux test with the Electron Beam (EB) gun test facility being newly built in Korea. This paper provides the current status of design and relevant R&D activities of the blanket system to secure key technologies and to fulfill our promise to ITER project.
引用
收藏
页码:126 / 130
页数:5
相关论文
共 15 条
[1]   Heat flux tests of the ITER first Wall qualification mockups at KoHLT-1 [J].
Bae, Y. D. ;
Kim, Suk-Kwon ;
Shin, H. Y. ;
Lee, D. W. ;
Hong, B. G. .
FUSION ENGINEERING AND DESIGN, 2011, 86 (4-5) :412-416
[2]   Ion-beam assisted deposition of coating interlayers for the joining of Be/CuCrZr [J].
Jung, Yang-Il ;
Lee, Jung-Suk ;
Park, Jeong-Yong ;
Choi, Byoung-Kwon ;
Jeong, Yong-Hwan ;
Hong, Bong-Guen .
FUSION ENGINEERING AND DESIGN, 2010, 85 (7-9) :1689-1692
[3]   WELDING TECHNOLOGY DEVELOPMENT FOR THE FABRICATION OF ITER BLANKET SHIELD BLOCK IN KOREA [J].
Kim, Duck Hoi ;
Kim, Byoung Yoon ;
Cho, Seungyon ;
Jung, Ki Jung ;
Choi, Im-Sub ;
Choi, Man-Ho ;
Kim, In-Ho ;
Lee, Gil-Young .
FUSION SCIENCE AND TECHNOLOGY, 2009, 56 (01) :43-47
[4]   Cooling optimization for preliminary design of ITER blanket shield block [J].
Kim, Duck-Hoi ;
Ha, Min-Su ;
Choi, Jong-Woong ;
Ahn, Hee-Jae ;
Bak, Joo-Shik ;
Jung, Ki-Jung .
FUSION ENGINEERING AND DESIGN, 2012, 87 (5-6) :921-926
[5]   THERMO-HYDRAULIC PERFORMANCE ANALYSIS FOR CONCEPTUAL DESIGN OF ITER BLANKET SHIELD BLOCK [J].
Kim, Duck-Hoi ;
Ha, Min-Su ;
Kim, Do-Hyeong ;
Lee, Young-Seok ;
Kim, Byoung-Chul ;
Ahn, Hee-Jae ;
Bak, Joo-Shik ;
Jung, Ki-Jung ;
Zhang, Fu .
FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (01) :118-122
[6]   Eddy current induced electromagnetic loads on shield blankets during plasma disruptions in ITER: A benchmark exercise [J].
Kim, Duck-Hoi ;
Oh, Dong-Keun ;
Pak, Sunil ;
Jhang, Hogun ;
Lee, Jaeyoul ;
Rozov, Vladimir .
FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) :1747-1758
[7]   Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype [J].
Kim, Suk-Kwon ;
Bae, Young-Dug ;
Jung, Hyun-Kyu ;
Jung, Yang-Il ;
Park, Jeong-Yong ;
Jeong, Yong-Hwan ;
Lee, Dong Won .
FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) :1766-1770
[8]   HIGH HEAT FLUX TEST OF THE KO STANDARD MOCKUPS FOR ITER FIRST WALL SEMI-PROTOTYPE [J].
Kim, Suk-Kwon ;
Bae, Young-Dug ;
Yoon, Jae-Sung ;
Jung, Hyun-Kyu ;
Jung, Yang-Il ;
Park, Jeong-Yong ;
Jeong, Yong-Hwan ;
Kim, Byoung Yoon ;
Lee, Dong Won .
FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (01) :161-164
[9]   Overview of Korea heat load test facilities for plasma facing components [J].
Kim, Suk-Kwon ;
Bae, Young-Dug ;
Lee, Dong Won ;
Hong, Bong Guen .
FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) :1834-1837
[10]   SMALL MOCK-UP FABRICATION AND HIGH HEAT FLUX TEST FOR PREPARING THE 2ND QUALIFICATION OF THE ITER BLANKET FIRST WALL [J].
Lee, Dong Won ;
Kim, Suk Kwon ;
Bae, Young-Dug ;
Jung, Yang Il ;
Park, Jeong Yong ;
Jeong, Yong Hwan ;
Kim, Byung Yoon .
FUSION SCIENCE AND TECHNOLOGY, 2011, 60 (01) :165-169