DEM Analysis of Stresses and Deformations of Geogrid-Reinforced Embankments over Piles

被引:162
作者
Han, Jie [1 ]
Bhandari, Anil [1 ,2 ]
Wang, Fei [3 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn CEAE, Lawrence, KS 66045 USA
[2] Terracon Consultants Inc, N Charleston, SC 29405 USA
[3] Southeast Univ, Inst Geotech Engn, Nanjing 210096, Jiangsu, Peoples R China
关键词
DEM; Embankment; Geogrid; Pile; Soil arching; IDEALIZED GRANULAR-MATERIALS; SUPPORTED EMBANKMENTS; NUMERICAL-ANALYSIS; SOFT SOIL; ASSEMBLIES; BEHAVIOR; MODEL; LOAD;
D O I
10.1061/(ASCE)GM.1943-5622.0000050
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The geosynthetic-reinforced pile-supported embankment is one of the favorable ground improvement techniques used in the construction of earth structures over a compressible soil when limited construction time is available and limited deformation is permissible. Various methods are available for the design of the geosynthetic-reinforced platform based on various load transfer mechanisms from the embankment to the piles and the compressible soil. The existence of the geosynthetic layer makes the mechanisms more complex. This study focuses on the behavior of geogrid-reinforced embankments over piles compared with the behavior of unreinforced embankments. The numerical simulations of the unreinforced and reinforced pile-supported embankments were conducted using the discrete element method (DEM). The embankment fill was simulated using unbonded graded aggregates of diameters ranging from 9.2 to 20.8 mm and the geogrid was simulated using bonded particles. This study investigated the changes of vertical and horizontal stresses and porosities, the vertical displacements within the embankment fill, and the deflection and tension in the geogrid. The simulation results showed that the coefficient of lateral earth pressure in the embankment fill changed from an initial at rest condition to a passive condition at certain locations after the compression of the compressible soil. The embankment fill dilated during the development of soil arching. The embankment load was transferred to the piles owing to the reorientation of the principal stresses. The results also showed that the geogrid reinforcement significantly reduced the total and differential settlements at the top of the embankment. (c) 2012 American Society of Civil Engineers.
引用
收藏
页码:340 / 350
页数:11
相关论文
共 34 条
[1]  
[Anonymous], 2004, PART FLOW COD 2 DIM
[2]   OBSERVATIONS ON STRESS FORCE FABRIC RELATIONSHIPS IN IDEALIZED GRANULAR-MATERIALS [J].
BATHURST, RJ ;
ROTHENBURG, L .
MECHANICS OF MATERIALS, 1990, 9 (01) :65-80
[3]  
Bhandari A., 2009, ASCE GEOTECHNICAL SP, V189, P47
[4]   Investigation of geotextile-soil interaction under a cyclic vertical load using the discrete element method [J].
Bhandari, Anil ;
Han, Jie .
GEOTEXTILES AND GEOMEMBRANES, 2010, 28 (01) :33-43
[5]  
British Standards Institution (BSI), 1995, BS8006 BSI
[6]   Dynamic spar elements and discrete element methods in two dimensions for the modeling of soil-inclusion problems [J].
Chareyre, B ;
Villard, P .
JOURNAL OF ENGINEERING MECHANICS, 2005, 131 (07) :689-698
[7]  
CHAREYRE B, 2002, NUMERICAL MODELLING, P197
[8]   An experimental investigation of soil arching within basal reinforced and unreinforced piled embankments [J].
Chen, Yun-min ;
Cao, Wei-ping ;
Chen, Ren-peng .
GEOTEXTILES AND GEOMEMBRANES, 2008, 26 (02) :164-174
[9]   Failure Mechanisms in Sand over a Deep Active Trapdoor [J].
Costa, Yuri D. ;
Zornberg, Jorge G. ;
Bueno, Benedito S. ;
Costa, Carina L. .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2009, 135 (11) :1741-1753
[10]   DISCRETE NUMERICAL-MODEL FOR GRANULAR ASSEMBLIES [J].
CUNDALL, PA ;
STRACK, ODL .
GEOTECHNIQUE, 1979, 29 (01) :47-65