共 50 条
[44]
An Effective Hybrid Algorithm for Permutation Flow Shop Scheduling Problem with Setup Time
[J].
51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS,
2018, 72
:1288-1292
[49]
A Hybrid Backtracking Search Algorithm for Permutation Flow-Shop Scheduling Problem Minimizing Makespan and Energy Consumption
[J].
2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM),
2017,
:1611-1615