Replacing the Beards Creek bridge

被引:0
作者
Walker, SE [1 ]
Matzat, SL [1 ]
机构
[1] Haley & Aldrich Inc, Rochester, NY USA
来源
HYDROGEOLOGY AND ENGINEERING GEOLOGY OF SINKHOLES AND KARST - 1999 | 1999年
关键词
D O I
暂无
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
In early March 1994, fresh water (more than 20 mgd) began pouring into the Retsof Salt Mine about 1,100 feet beneath the Beards Creek bridge in western New York. Despite efforts to stop it, the inflow continued until early 1996 when the 6,500-acre mine became completely flooded. The effects of the inflow were twofold; a loss of ground in and above the limestone aquifer about 600 feet above the mine, and the closure of the mine cavity at and spreading radially from the location of the inflow. These effects manifested themselves in the development of two sinkholes immediately upstream of the bridge. Concurrently with the inflow and development of the sinkholes, the bridge began to settle rapidly and was declared unsafe and taken out of service. By March 1996 the bridge had settled more than 15 feet and moved approximately 5 feet upstream toward the sinkholes. To meet the public need, the bridge was replaced, at its previous location. The authors' firms designed and oversaw the construction of the replacement bridge on an overlapping, fast-track schedule. The approach roadways were restored to a level of serviceability (flood survivability) equivalent to that existing prior to the recent ground subsidence. This required the placement of more than 30,000 tons of new earthfill. The authors' firms also performed close monitoring of displacement and piezometric responses to the fill and structural loadings. This allowed completion and opening of the bridge in less than 10 months while accommodating the anticipated 8 in of construction-phase settlement. This paper presents summaries of the fast-track design and construction process and of the movements of the bridge and embankments during and following construction.
引用
收藏
页码:179 / 184
页数:6
相关论文
共 50 条
  • [31] WRY SERIOUSNESS OF 'OWL CREEK BRIDGE'
    LOGAN, FJ
    AMERICAN LITERARY REALISM 1870-1910, 1977, 10 (02): : 101 - 113
  • [32] Second Thane creek bridge -An overview
    Borkar, A.G.
    Tambe, S.R.
    Indian Concrete Journal, 2017, 91 (08): : 82 - 87
  • [33] Grazing limits benefited Bridge Creek
    Demmer, Rick
    Beschta, Robert L.
    SCIENCE, 2018, 361 (6407) : 1081 - 1081
  • [34] Beards
    Behm-Steinberg, Hugh
    WESTERN HUMANITIES REVIEW, 2021, 75 (03) : 87 - 104
  • [35] Beards
    Southern, Antonia
    TLS-THE TIMES LITERARY SUPPLEMENT, 2009, (5560): : 6 - 6
  • [36] BEARDS
    不详
    NEW REPUBLIC, 1966, 154 (06) : 7 - 7
  • [37] Replacing a Steel Bridge Using Longitudinal Rotation
    Dolejs, Jakub
    Cervenka, Petr
    Werunsky, Martin
    Kolpasky, Ludvik
    Pribramsky, Vladimir
    Ryjacek, Pavel
    STRUCTURAL ENGINEERING INTERNATIONAL, 2024, 34 (01) : 97 - 101
  • [38] Optimum replacing period of nonpermanent bridge components
    Wei, Pu
    Xiao, Rucheng
    Sun, Bo
    LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 1824 - 1829
  • [39] PINE VALLEY CREEK BRIDGE A FIRST.
    Bezzone, A.P.
    Civil Engineering (New York), 1974, 44 (08): : 72 - 75
  • [40] Implementation of the deep DWB in the Dickey Creek Bridge
    Hayes, MD
    Waldron, C
    Schniepp, T
    Lesko, JJ
    Cousins, TC
    2001: A MATERIALS AND PROCESSES ODYSSEY, BOOKS 1 AND 2, 2001, 46 : 1587 - 1596