Efficient reactive scheduling of multi-product batch plants under equipment failure uncertainty

被引:0
|
作者
Zhu, Jin [1 ]
Gu, Xingsheng [2 ]
Gu, Wei [1 ]
机构
[1] Shanghai Maritime Univ, Marine Technol & Control Engn Key Lab, Shanghai 200135, Peoples R China
[2] East China Univ Sci & Technol, Res Inst Automat, Shanghai 200237, Peoples R China
来源
PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS | 2008年
基金
中国国家自然科学基金;
关键词
scheduling; batch plants; uncertainty; genetic algorithm;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a novel formulation for short-term scheduling of multi-product batch plants under equipment failure uncertainty was presented and solved by an improved genetic algorithm. The reactive schedule problem was formulated as a mixed integer linear programming (MILP) problem using a continuous-time representation, which leads to a smaller number of binary and continuous variables thus, resulting in reduced computational times. It was shown that the proposed approach results in an efficient utilization of the plant capability as it allows the optimal selection among all rescheduling alternatives in a systematic way without the use of any heuristics. The objective function includes a term for profit maximization and a penalty term that was used to minimize the deviations from the original schedule. According to the discrete characteristic of scheduling of batch plants, through the improvement of the coding method, an effective genetic algorithm is presented. Two examples were used to illustrate the effectiveness of the pro posed formulation and algorithm. Comparisons with other approached were provided.
引用
收藏
页码:292 / +
页数:3
相关论文
共 50 条
  • [1] Efficient short-term scheduling of multiproduct batch plants under demand uncertainty
    Zhu, Jin
    Gu, Xingsheng
    Jiao, Bin
    PROGRESS IN NATURAL SCIENCE-MATERIALS INTERNATIONAL, 2008, 18 (04) : 487 - 493
  • [2] Scheduling of multi-product batch plants based upon timed automata models
    Panek, Sebastian
    Engell, Sebastian
    Subbiah, Subanatarajan
    Stursberg, Olaf
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (1-2) : 275 - 291
  • [3] Scheduling of a multi-product polymer batch plant
    Schulz, C
    Engell, S
    Rudolf, R
    THIRD INTERNATIONAL CONFERENCE ON FOUNDATIONS OF COMPUTER-AIDED PROCESS OPERATIONS, 1998, 94 (320): : 224 - 230
  • [4] Batch production and preventive maintenance scheduling under equipment failure uncertainty
    Sanmarti, E
    Espuna, A
    Puigjaner, L
    COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 (10) : 1157 - 1168
  • [5] Optimization of multi-product batch plant design under uncertainty with environmental considerations
    Zheng Wang
    Xiao-Ping Jia
    Lei Shi
    Clean Technologies and Environmental Policy, 2010, 12 : 273 - 282
  • [6] Optimization of multi-product batch plant design under uncertainty with environmental considerations
    Wang, Zheng
    Jia, Xiao-Ping
    Shi, Lei
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2010, 12 (03) : 273 - 282
  • [7] Scheduling of a multi-product batch process in the chemical industry
    Blomer, F
    Gunther, HO
    COMPUTERS IN INDUSTRY, 1998, 36 (03) : 245 - 259
  • [8] Scheduling of multi-product batch plants using reachability analysis of timed automata models
    Subbiah, Subanatarajan
    Panek, Sebastian
    Engell, Sebastian
    Stursberg, Olaf
    ICINCO 2007: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL ICSO: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2007, : 141 - +
  • [9] Cooperative hybrid evolutionary algorithm for large scale multi-stage multi-product batch plants scheduling problem
    Han, Yuxin
    Gu, Xingsheng
    NEUROCOMPUTING, 2021, 419 : 80 - 96
  • [10] A novel MILP formulation for short-term scheduling of multistage multi-product batch plants
    Hui, CW
    Gupta, A
    COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (2-7) : 1611 - 1617