共 13 条
- [1] Study and Application of Information Management System for Government-invested Construction Projects ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2445 - +
- [2] Research on the implementing model of Chinese government-invested construction project PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2006, : 59 - 64
- [3] On Agent Constructor Choosing System Of Government-Invested Project ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 136 - 140
- [4] Study about Implementing Agent-construction System on Government Investment Project in Beijing PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2008, : 522 - 527
- [5] Research on the Governance Structure of Different Agent-construction System Models in Government Investment Projects PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (5TH), VOL II, 2009, : 142 - 146
- [6] Studies on Problems and Countermeasures of Agent Construction System in Chinese government investment projects -Based on the Incentive perspective 2012 WORLD AUTOMATION CONGRESS (WAC), 2012,
- [7] A Study on the Comparison and Selection of Agent-Construction Modes in Chinese Government Investment Projects ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 938 - 945
- [8] Existing Problems and Countermeasures of Chinese Local Government in Integrity Construction PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (9TH), VOL II, 2013, : 40 - 46
- [9] The research on problems of incentive mechanism in the relationship of agent-construction system ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 2243 - +
- [10] The Existing Problems of Current Chinese Government Internet Supervision System and Countermeasures PROCEEDINGS OF 2012 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (8TH), VOL III, 2012, : 753 - 758