Nhat Tan Bridge - The Biggest Cable-Stayed Bridge in Vietnam

被引:9
作者
Swit, Grzegorz [1 ]
Krampikowska, Aleksandra [1 ]
Luong Minh Chinh [2 ]
Adamczak, Anna [1 ]
机构
[1] Kielce Univ Technol, Aleja 1000 Lecia Panstwa Polskiego 7, PL-25314 Kielce, Poland
[2] Thuy Loi Univ, 175 Tay Son, Hanoi, Vietnam
来源
WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016 | 2016年 / 161卷
关键词
cable-stayed bridge; suspension bridge; Nhat Tan; the largest bridge in Vietnam;
D O I
10.1016/j.proeng.2016.08.730
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In recent years, Vietnam has seen a rapidly expanding transport infrastructure, especially roads and bridges, the latter ones being large-size structures. This is determined by the geological features of the area with a very high number of large rivers. A significant part of the bridges in this country are cable-stayed. The first large cable-stayed bridge My Thuan was completed in 2000, whereas Can Tho Bridge completed in 2010 is the cable-stayed bridge with the largest span length in Vietnam - 500m. Cable stayed bridges are very effective structures due to their lightweight decks and large lever arms of forces. The most important element of these impressive and elegant structures are closely spaced wire cables, which transmit loads through the pylons to the foundations. Today, in Vietnam there are several structures of this type. In 2015 the largest cable-stayed bridge - Nhat Tan bridge connecting Hanoi to the airport was completed. Noi Bai International Airport and the center of Hanoi are separated by 1 km wide Red River. Thang Long Bridge, built 30 years ago, was the only connection across this river. Nhat Tan Bridge is an alternative and more direct access to the road, shortening the travel time from the airport. The main bridge, 1500 m long cable-stayed structure with many spans, is a very rare type of bridge in the world and it is one of the longest bridges in Southeast Asia. This bridge, the gateway to Hanoi, also serves as a symbol of friendship between Vietnam and Japan. This article presents the design of the bridge, the course of its construction and the technologies that have been applied. At present, several large bridges are also under construction throughout the country. (C) 2016 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:666 / 673
页数:8
相关论文
共 50 条
  • [31] NONLINEAR SEISMIC RESPONSE ANALYSIS OF A CABLE-STAYED BRIDGE
    Wei, Demin
    Gao, Xiaonan
    Kong, Peng
    INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2011, : 864 - 868
  • [32] Research of a New Form Traveler on Cable-Stayed Bridge
    Lei Xiao
    Zhou Yongjun
    Liu Yufeng
    Zhou Yu
    Wang Jianmin
    MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 2119 - +
  • [33] Monitoring of the Alamillo cable-stayed bridge during construction
    Casas, JR
    Aparicio, AC
    EXPERIMENTAL MECHANICS, 1998, 38 (01) : 24 - 28
  • [34] ANALYSIS OF INTERACTION BETWEEN THE ELEMENTS IN CABLE-STAYED BRIDGE
    Straupe, Verners
    Paeglitis, Ainars
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2012, 7 (02): : 84 - 91
  • [35] STOCHASTIC RESPONSE TO EARTHQUAKE FORCES OF A CABLE-STAYED BRIDGE
    SUNGUR, I
    ENGINEERING STRUCTURES, 1993, 15 (05) : 307 - 314
  • [36] Automated Operational Modal Analysis of a Cable-Stayed Bridge
    Sun, Miao
    Alamdari, Mehrisadat Makki
    Kalhori, Hamed
    JOURNAL OF BRIDGE ENGINEERING, 2017, 22 (12)
  • [37] Numerical analysis of a cable-stayed bridge to blast loads
    Tang, Edmond Kai Cheong
    Hao, Hong
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON SHOCK & IMPACT LOADS ON STRUCTURES, 2007, : 557 - 564
  • [38] Monitoring of the Alamillo cable-stayed bridge during construction
    J. R. Casas
    A. C. Aparicio
    Experimental Mechanics, 1998, 38 : 24 - 28
  • [39] Modal interaction in cable-stayed Ting Kau Bridge
    Ni, YQ
    Wang, JY
    Ko, JM
    ADVANCES IN STRUCTURAL DYNAMICS, VOLS I & II, 2000, 10 : 537 - 544
  • [40] Construction and Geometry Control of Incheon Cable-Stayed Bridge
    Yang, Jong-Ho
    Im, Duk-Ki
    Kim, Chang-Hyun
    Ahn, Sang-Sup
    Lee, Wan-Soo
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 49 - 52