A standby repairable system with rest of server between repairs

被引:2
|
作者
Aggarwal, Chhama [1 ]
Malik, S. C. [1 ]
机构
[1] Maharshi Dayanand Univ, Dept Stat, Rohtak 124001, Haryana, India
来源
关键词
Repairable System; Stochastic Model; Rest of the Server; Reliability Measures; Arbitrary Probability Distributions and Profit Analysis;
D O I
10.1080/09720510.2020.1737382
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
A cold standby repairable system of two identical units has been analyzed stochastically in detail by considering the idea of rest of the server between repairs. The unit has two modes - normal and complete failure. There is a single server who is allowed to take rest before starting repair of the unit which was waiting for the repair. The random variables associated with repair and rest time of the server follow arbitrary distribution with different probability density functions while the failure rate of the unit is considered as constant. The semi-Markov process and regenerative point technique are used to derive the expressions for mean time to system failure (MTSF), availability, busy period of the server due to repair, expected number of repairs and profit function. The profit analysis of the system model has been carried out for particular values of the parameters. The profit of the system model has also been observed for change in the revenue per unit time, change in the cost for which server is busy due to repair and change in the cost per repair per unit time.
引用
收藏
页码:1485 / 1496
页数:12
相关论文
共 50 条
  • [1] Profit Analysis of a Standby Repairable System with Priority to Preventive Maintenance and Rest of Server Between Repairs
    Aggarwal, Chhama
    Ahlawat, Nitika
    Malik, S. C.
    JOURNAL OF RELIABILITY AND STATISTICAL STUDIES, 2021, 14 (01): : 57 - 79
  • [2] A COLD STANDBY SYSTEM WITH ARRIVAL TIME OF SERVER AND CORRELATED FAILURES AND REPAIRS
    GOEL, LR
    TYAGI, PK
    GUPTA, R
    MICROELECTRONICS AND RELIABILITY, 1995, 35 (04): : 739 - 742
  • [3] RELIABILITY OF A REPAIRABLE SYSTEM WITH STANDBY FAILURE
    SUBRAMANIAN, R
    VENKATAKRISHNAN, KS
    KISTNER, KP
    OPERATIONS RESEARCH, 1976, 24 (01) : 169 - 176
  • [4] Availability for a repairable system with finite repairs
    Cui, LR
    Li, JL
    Advanced Reliability Modeling, 2004, : 97 - 100
  • [5] Reliability estimation of a repairable standby redundant system
    Pradip Bhuyan
    Pranita Sarmah
    Statistical Papers, 2002, 43 : 323 - 336
  • [7] Replacement problems for a cold standby repairable system
    Zhang, YL
    Wang, GJ
    Ji, ZC
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2006, 37 (01) : 17 - 25
  • [8] Reliability estimation of a repairable standby redundant system
    Bhuyan, P
    Sarmah, P
    STATISTICAL PAPERS, 2002, 43 (03) : 323 - 336
  • [9] On the transient behaviour of a repairable system with a warm standby
    Gopalan, MN
    Kumar, UD
    MICROELECTRONICS AND RELIABILITY, 1996, 36 (04): : 525 - 532
  • [10] 2 UNIT REPAIRABLE REDUNDANT STANDBY SYSTEM
    SINGH, RP
    MISRA, RB
    MICROELECTRONICS AND RELIABILITY, 1990, 30 (02): : 289 - 298