Journey time estimator for assessment of road network performance under demand uncertainty

被引:19
作者
Shao, Hu [1 ,2 ]
Lam, William H. K. [1 ,3 ]
Sumalee, Agachai [1 ]
Chen, Anthony [4 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Kowloon, Hong Kong, Peoples R China
[2] China Univ Min & Technol, Dept Math, Xuzhou 221116, Jiangsu, Peoples R China
[3] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
[4] Utah State Univ, Dept Civil & Environm Engn, Logan, UT 84322 USA
基金
中国国家自然科学基金;
关键词
Journey time estimator; Network performance; Demand uncertainty; Least Squares; Reliability; TRAFFIC COUNT INCONSISTENCIES; ORIGIN-DESTINATION MATRICES; TRAVEL-TIME; INFORMATION-SYSTEMS; MODEL; RELIABILITY;
D O I
10.1016/j.trc.2012.12.002
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
This paper proposes a journey time estimator (JTE) to estimate the stochastic journey time of each path for performance assessment in road network with uncertainty due to day-to-day demand variations. The stochastic network framework is adopted in this paper, in which link flows and path journey times are modeled as random variables so as to fully utilize the first- and the second-order statistical properties of the partial data collected for the journey time estimation. The second-order statistical property is referred to the variance-covariance (var-cov) of the observed path journey times and link flows available for the estimation. In this paper, the proposed JTE is formulated as a bi-level optimization problem. The objective of the upper-level problem is a variant of the Least Squares function, which considers the mean and var-cov of the observed path journey times. In addition, the observed statistical distribution of the link flow is also used to formulate a chance constraint in the upper-level problem. The lower-level problem is the reliability-based stochastic user equilibrium traffic assignment problem in stochastic network, which explicitly considers the reliability-based path choice behaviors of the road users under demand uncertainty. A heuristic iterative estimation-assignment algorithm is employed to solve the proposed hi-level problem. Numerical examples are provided to demonstrate the applications of the JTE and efficiency of the proposed algorithm. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:244 / 262
页数:19
相关论文
共 50 条
  • [21] Design of robust distribution network under demand uncertainty: A case study in the pulp and paper
    Ouhimmou, Mustapha
    Nourelfath, Mustapha
    Bouchard, Mathieu
    Bricha, Naji
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 218 : 96 - 105
  • [22] On-Demand Greenwave for Emergency Vehicles in a Time-Varying Road Network With Uncertainties
    Min, Wanli
    Yu, Liang
    Chen, Peng
    Zhang, Maolei
    Liu, Yu
    Wang, Jiawei
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2020, 21 (07) : 3056 - 3068
  • [23] Rural road network performance and pre-disaster planning: an assessment methodology considering redundancy
    Shrestha, Jagat K.
    Pudasaini, Pramesh
    Mussone, Lorenzo
    TRANSPORTATION PLANNING AND TECHNOLOGY, 2021, 44 (07) : 726 - 743
  • [24] Robust inventory control under demand and lead time uncertainty
    Andreas Thorsen
    Tao Yao
    Annals of Operations Research, 2017, 257 : 207 - 236
  • [25] Robust inventory control under demand and lead time uncertainty
    Thorsen, Andreas
    Yao, Tao
    ANNALS OF OPERATIONS RESEARCH, 2017, 257 (1-2) : 207 - 236
  • [26] Fuzzy-based network bandwidth design under demand uncertainty
    Yu, Lean
    Yue, Wuyi
    Wang, Shouyang
    JOURNAL OF SYSTEMS SCIENCE & COMPLEXITY, 2010, 23 (01) : 61 - 70
  • [27] Mobile Network Slicing under Demand Uncertainty: A Stochastic Programming Approach
    Gholami, Anousheh
    Torkzaban, Nariman
    Baras, John S.
    2023 IEEE 9TH INTERNATIONAL CONFERENCE ON NETWORK SOFTWARIZATION, NETSOFT, 2023, : 272 - 276
  • [28] Designing an integrated pharmaceutical relief chain network under demand uncertainty
    Akbarpour, Mina
    Torabi, S. Ali
    Ghavamifar, Ali
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2020, 136 (136)
  • [29] FUZZY-BASED NETWORK BANDWIDTH DESIGN UNDER DEMAND UNCERTAINTY
    Lean YU Institute of Systems Science
    JournalofSystemsScience&Complexity, 2010, 23 (01) : 61 - 70
  • [30] Fuzzy-based network bandwidth design under demand uncertainty
    Lean Yu
    Wuyi Yue
    Shouyang Wang
    Journal of Systems Science and Complexity, 2010, 23 : 61 - 70