Energy and Reserve Scheduling Under Wind Power Uncertainty: An Adjustable Interval Approach

被引:59
作者
Doostizadeh, Meysam [1 ]
Aminifar, Farrokh [1 ]
Ghasemi, Hassan [1 ]
Lesani, Hamid [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Elect & Comp Engn, Tehran 113654563, Iran
关键词
Day-ahead market energy and reserve scheduling; ramping capability; wind power uncertainty; ROBUST UNIT COMMITMENT; GENERATION; SECURITY;
D O I
10.1109/TSG.2016.2572639
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an adjustable interval optimization model for the energy and reserve clearance while treating the wind power variation and uncertainty. Instead of conventional predicted intervals (PIs), adjustable intervals (AIs) as subsets of PIs are proposed as more judicious choices for economically covering wind uncertainties. Ramp-capability reserve is modeled to ensure the existence of sufficient ramp capability needed to follow up wind power variation within AIs. However, realization of wind power beyond AIs, which is no longer compensable by ramp-capability reserve, would necessarily lead to either load shedding or wind spillage. In order to optimally determine AIs, apart from the energy and reserve procurement costs, the costs associated with load shedding and wind spillage are incorporated in the objective function. The confidence level theory is employed as well for tuning the robustness and conservatism of the final solution. Performance of the proposed method is examined on several case studies on an 8-bus and modified IEEE 118-bus test systems. Sensitivity analyses are conducted to specify the impacts of important parameters on the obtained solution. The results confirm the applicability and effectiveness of the proposed methodology.
引用
收藏
页码:2943 / 2952
页数:10
相关论文
共 29 条
[1]  
[Anonymous], 2001, Probability, Random Variables and Stochastic Processes
[2]  
[Anonymous], 2007, Pac. J. Optim., DOI DOI 10.18452/2928
[3]   Identification of Umbrella Constraints in DC-Based Security-Constrained Optimal Power Flow [J].
Ardakani, Ali Jahanbani ;
Bouffard, Francois .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) :3924-3934
[4]   Correlated wind-power production and electric load scenarios for investment decisions [J].
Baringo, L. ;
Conejo, A. J. .
APPLIED ENERGY, 2013, 101 :475-482
[5]   The price of robustness [J].
Bertsimas, D ;
Sim, M .
OPERATIONS RESEARCH, 2004, 52 (01) :35-53
[6]   Stochastic security for operations planning with significant wind power generation [J].
Bouffard, Francois ;
Galiana, Francisco D. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (02) :306-316
[7]   A Hybrid Stochastic/Interval Approach to Transmission-Constrained Unit Commitment [J].
Dvorkin, Yury ;
Pandzic, Hrvoje ;
Ortega-Vazquez, Miguel A. ;
Kirschen, Daniel S. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (02) :621-631
[8]   Uncertainty Sets for Robust Unit Commitment [J].
Guan, Yongpei ;
Wang, Jianhui .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (03) :1439-1440
[9]   Robust SCUC Considering Continuous/Discrete Uncertainties and Quick-Start Units: A Two-Stage Robust Optimization With Mixed-Integer Recourse [J].
Hu, Bingqian ;
Wu, Lei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (02) :1407-1419
[10]   Robust Unit Commitment With Wind Power and Pumped Storage Hydro [J].
Jiang, Ruiwei ;
Wang, Jianhui ;
Guan, Yongpei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :800-810