Performance and economic assessments of integrating geothermal energy into coal-fired power plant with CO2 capture

被引:26
|
作者
Wang, Fu [1 ,2 ]
Deng, Shuai [1 ]
Zhao, Jun [1 ]
Wang, Junyao [1 ]
Sun, Taiwei [1 ]
Yan, Jinyue [1 ,3 ,4 ]
机构
[1] Tianjin Univ, Key Lab Efficient Utilizat Low & Medium Grade Ene, Minist Educ China, Tianjin 300072, Peoples R China
[2] Ningbo Univ, Fac Maritime & Transportat, Ningbo 315211, Zhejiang, Peoples R China
[3] Malardalen Univ, Sch Business Soc & Technol, SE-72123 Vastras, Sweden
[4] Royal Inst Technol, Dept Chem Engn, SE-10044 Stockholm, Sweden
关键词
CO2; capture; Geothermal energy; Geothermal power plant; Renewable energy; Cost; CARBON CAPTURE; SOLAR-ENERGY; CHEMICAL ABSORPTION; GENERATION; CYCLE; LEVEL;
D O I
10.1016/j.energy.2016.12.029
中图分类号
O414.1 [热力学];
学科分类号
摘要
A novel carbon capture and storage system integrated with geothermal energy was proposed to reduce energy consumption in the post-combustion CO2 capture (PCC) process. Geothermal energy at medium temperature was used to provide the heat required for solvent regeneration. A technical and economic assessment was conducted based on a 300 MWe coal-fired power plant. Additionally, the integrated system was also compared with a stand-alone geothermal power (GP) plant to evaluate individual advantages. Both an enhanced geothermal system (EGS) and a hot sedimentary aquifer (HSA) reservoir were selected to identify the effect of geological properties and heat characteristics on system performance. The results indicated that the geothermal-assisted post-combustion CO2 capture (GPCC) plant exhibited better performance than the PCC plant. The net plant average efficiency increased 5.56% and 4.42% in the EGS scenario and HSA scenario, respectively. Furthermore, the net incremental geothermal efficiency obtained corresponded to 21.34% and 20.35% in the EGS scenario and HSA scenario, respectively. The economic assessment indicated that the GPCC systems in both the EGS scenario and HSA scenario had lower marginal cost of electricity (70.84 $/MWh and 101.06 SiMWh) when compared with that of the stand-alone GP systems (151.09 $/MWh and 101.95 SiMWh). (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:278 / 287
页数:10
相关论文
共 50 条
  • [41] Integrating solar Organic Rankine Cycle into a coal-fired power plant with amine-based chemical absorption for CO2 capture
    Zhao, Li
    Zhao, Ruikai
    Deng, Shuai
    Tan, Yuting
    Liu, Yinan
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2014, 31 : 77 - 86
  • [42] Making deep reductions in CO2 emissions from coal-fired power plant using capture and storage CO2
    Freund, P
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 2003, 217 (A1) : 1 - 7
  • [43] Energy and exergy analyses of S–CO2 coal-fired power plant with reheating processes
    Chen Z.
    Wang Y.
    Zhang X.
    Energy, 2021, 211
  • [44] Analysis of Flexible CO2 Capture Scheme for Novel Solar Energy-DCP System in Coal-fired Power Plant
    Yang, Ning
    Kong, Dehao
    Zhou, Yunlong
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (14): : 4547 - 4558
  • [45] Novel system integrations of 1000 MW coal-fired power plant retrofitted with solar energy and CO2 capture system
    Zhai, Rongrong
    Qi, Jiawei
    Zhu, Yong
    Zhao, Miaomiao
    Yang, Yongping
    APPLIED THERMAL ENGINEERING, 2017, 125 : 1133 - 1145
  • [46] Flash evaporation and thermal vapor compression aided energy saving CO2 capture systems in coal-fired power plant
    Zhang, Kefang
    Liu, Zhongliang
    Wang, Yuanya
    Li, Yanxia
    Li, Qingfang
    Zhang, Jian
    Liu, Haili
    ENERGY, 2014, 66 : 556 - 568
  • [47] Performance analysis of a 500MWe coal-fired power plant with a post-combustion CO2 capture process
    Lee, Ji Hyun
    Kwak, No Sang
    Lee, In-Young
    Jang, Kyung-Ryoung
    Shim, Jae-Goo
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2013, 227 (03) : 149 - 156
  • [48] China baseline coal-fired power plant with post-combustion CO2 capture: 1. Definitions and performance
    Cui, Qian
    Lu, Haoren
    Li, Chufu
    Singh, Surinder
    Ba, Liming
    Zhao, Xinglei
    Ku, Anthony Y.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2018, 78 : 37 - 47
  • [49] Performance analysis of existing 600MW coal-fired power plant with MEA-based CO2 capture
    Xu, Gang
    Li, Shoucheng
    Yuan, Xing
    Yang, Yongping
    Song, Xiaona
    MECHANICAL AND ELECTRONICS ENGINEERING III, PTS 1-5, 2012, 130-134 : 3807 - +
  • [50] Techno-economic study of biomass co-firing with and without CO2 capture in an Australian black coal-fired power plant
    Khorshidi, Zakieh
    Ho, Minh T.
    Wiley, Dianne E.
    GHGT-11, 2013, 37 : 6035 - 6042