Safety of Maglev Trains Moving on Bridges Subject to Foundation Settlements and Earthquakes

被引:36
作者
Ju, S. H. [1 ]
Leong, C. C. [1 ]
Ho, Y. S. [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Civil Engn, Tainan 70101, Taiwan
关键词
Earthquake; FEM; Foundation settlement; Maglev train; Proportional-integral (PI) control; Rail irregularities; HIGH-SPEED TRAINS; FINITE-ELEMENT-ANALYSIS; DYNAMIC-RESPONSE; VEHICLES; SYSTEM;
D O I
10.1061/(ASCE)BE.1943-5592.0000506
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper investigates the safety of a series of maglev trains moving on multispan bridges undergoing foundation settlements and earthquakes. Rail irregularities, the proportional-integral (PI) controller with constant tuning gains, and maglev train-guideway-bridge interactions are considered in the three-dimensional (3D) nonlinear finite-element analysis. The numerical results indicate that the air gaps are slightly dependent on the train speed for the foundation settlements, but are almost independent of it for the seismic loads. When the initial ratio of lateral-to-vertical electromagnetic forces (Gy/Gz) is enlarged, the maglev train can sustain a larger earthquake. For the train with 1-cm air gaps and uniform maglev forces, the finite-element results indicate that the difference in the critical vertical foundation settlement between two piers can be extended to 3 cm, and the critical bridge lateral deflection can be extended to 2.2 cm under Gy/Gz=1. For seismic loads, the maximum lateral ground acceleration can be extended to 410cm/s2 for the air gaps equal to 10 cm under Gy/Gz=0.5. These conditions indicate that the electromagnetic suspension (EMS) system can overcome the problem of foundation settlement, and the electrodynamic suspension (EDS) system can overcome both foundation settlement and earthquake problems. (C) 2014 American Society of Civil Engineers.
引用
收藏
页码:91 / 100
页数:10
相关论文
共 20 条
[1]   Impact study of cable-stayed railway bridges with random rail irregularities [J].
Au, FTK ;
Wang, JJ ;
Cheung, YK .
ENGINEERING STRUCTURES, 2002, 24 (05) :529-541
[2]   H2 and H∞ control for MagLev vehicles [J].
Bittar, A ;
Sales, RM .
IEEE CONTROL SYSTEMS MAGAZINE, 1998, 18 (04) :18-25
[3]   Electromagnetic Design of a Novel Linear Maglev Transportation Platform With Finite-Element Analysis [J].
Duan, Ji-An ;
Zhou, Hai-Bo ;
Guo, Ning-Ping .
IEEE TRANSACTIONS ON MAGNETICS, 2011, 47 (01) :260-263
[4]   3D analysis of high-speed trains moving on bridges with foundation settlements [J].
Ju, S. H. .
ARCHIVE OF APPLIED MECHANICS, 2013, 83 (02) :281-291
[5]   A finite element method for analysis of Vibration induced by maglev trains [J].
Ju, S. H. ;
Ho, Y. S. ;
Leong, C. C. .
JOURNAL OF SOUND AND VIBRATION, 2012, 331 (16) :3751-3761
[6]   Nonlinear analysis of high-speed trains moving on bridges during earthquakes [J].
Ju, S. H. .
NONLINEAR DYNAMICS, 2012, 69 (1-2) :173-183
[7]  
Ju SH, 2010, CMES-COMP MODEL ENG, V64, P91
[8]   Experimentally investigating finite element accuracy for ground vibrations induced by high-speed trains [J].
Ju, Shen-Haw ;
Lin, Hung-Ta .
ENGINEERING STRUCTURES, 2008, 30 (03) :733-746
[9]   A simple finite element model for vibration analyses induced by moving vehicles [J].
Ju, Shen-Haw ;
Lin, Hung-Ta ;
Hsueh, Chung-Cheng ;
Wang, Shin-Lin .
INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN ENGINEERING, 2006, 68 (12) :1232-1256
[10]   Dynamic response and robust control of coupled maglev vehicle and guideway system [J].
Kong, Eunho ;
Song, Ji-Seok ;
Kang, Bu-Byoung ;
Na, Sungsoo .
JOURNAL OF SOUND AND VIBRATION, 2011, 330 (25) :6237-6253