Energetic and exergetic optimized Rankine cycle for waste heat recovery in a cement factory

被引:45
作者
Rad, Ehsan Amiri [1 ]
Mohammadi, Saeed [1 ]
机构
[1] Hakim Sabzevari Univ, Sabzevar, Iran
关键词
Cement production; Steam cycle; Waste heat power generation; Energy and exergy analyses; EXERGOECONOMIC ANALYSIS; POWER-GENERATION; ROTARY KILN; ORC; INDUSTRY; SYSTEMS; PLANT; COGENERATION;
D O I
10.1016/j.applthermaleng.2017.12.076
中图分类号
O414.1 [热力学];
学科分类号
摘要
The cement industry is one of the largest industries with regard to energy consumption. In the current study, the waste heat from the chimneys of Sabzevar cement factory was used to generate power with the use of the steam cycle in order to improve the energy efficiency. The results revealed that the increase in the boiler pressure decreased the total amount of the recovered energy due to the increase in the final temperature of the exhaust gases. But, the steam cycle efficiency was increased. Therefore, there would be an optimum pressure for the recovery boiler based on the energy and exergy analyses. Accordingly, the maximum exergy absorption from the waste heat of the chimneys of Sabzevar cement factory occurred at the pressure of 891.8 kPa. Considering the work consumption of air-cooled condenser fans, the maximum net power occurred at the recovery boiler pressure of 1398 kPa. The highest overall energy and exergy efficiencies also occurred at this pressure. Moreover, the effects of the important operating parameters, including the maximum cycle temperature, environmental temperature and condenser pressure on the optimum pressure were investigated. Results indicated that the boiler optimum pressure was independent from the operating parameters and remained constant, when these parameters changed. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:410 / 422
页数:13
相关论文
共 26 条
[1]   Waste Heat Recovery Power Generation Systems for Cement Production Process [J].
Amiri, Ali ;
Vaseghi, Mohammad Rahim .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2015, 51 (01) :13-19
[2]   Thermodynamic and exergoeconomic analysis of a cement plant: Part II - Application [J].
Atmaca, Adem ;
Yumrutas, Recep .
ENERGY CONVERSION AND MANAGEMENT, 2014, 79 :799-808
[3]   Thermodynamic and exergoeconomic analysis of a cement plant: Part I - Methodology [J].
Atmaca, Adem ;
Yumrutas, Recep .
ENERGY CONVERSION AND MANAGEMENT, 2014, 79 :790-798
[4]  
Cengel Y.A., 2015, THERMODYNAMIC
[5]   Energy auditing and recovery for dry type cement rotary kiln systems - A case study [J].
Engin, T ;
Ari, V .
ENERGY CONVERSION AND MANAGEMENT, 2005, 46 (04) :551-562
[6]   Multi-criteria exergy based optimization of an Organic Rankine Cycle for waste heat recovery in the cement industry [J].
Fergani, Zineb ;
Touil, Djamel ;
Morosuk, Tatiana .
ENERGY CONVERSION AND MANAGEMENT, 2016, 112 :81-90
[7]  
Jesionek Krzysztof, WHR CHP PROCESSES CE
[8]   Energy audit and conservation opportunities for pyroprocessing unit of a typical dry process cement plant [J].
Kabir, G. ;
Abubakar, A. I. ;
El-Nafaty, U. A. .
ENERGY, 2010, 35 (03) :1237-1243
[9]   Energetic and exergetic analysis of waste heat recovery systems in the cement industry [J].
Karellas, S. ;
Leontaritis, A-D ;
Panousis, G. ;
Bellos, E. ;
Kakaras, E. .
ENERGY, 2013, 58 :147-156
[10]   Energy balance and cogeneration for a cement plant [J].
Khurana, S ;
Banerjee, R ;
Gaitonde, U .
APPLIED THERMAL ENGINEERING, 2002, 22 (05) :485-494