Scheduling parallel machines with resource-dependent processing times

被引:33
|
作者
Su, Ling-Huey [1 ]
Lien, Chun-Yuan [1 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind Engn, Chungli, Taiwan
关键词
Parallel machines; Resource-dependent processing times; Heuristics; Makespan; BIN-PACKING; JOBS; MAKESPAN; MINIMIZE; LINES;
D O I
10.1016/j.ijpe.2008.10.014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling parallel machines with resource-dependent processing time is common in many operations management, especially in breaking processing bottlenecks in the Theory of Constraint and lean production. This study considers the problem of scheduling a set of jobs on parallel machines when the processing time of each job depends oil the amount of resource consumed. Such scheduling aims to determine the allocation of resources to jobs and jobs to machines to minimize the makespan. The problem has been proven to be NP-hard even for the fixed job processing times. This study first proposes a heuristic called CL for minimizing makespan in the parallel machines problem parallel to C-max) and then compares it with the LISTFIT heuristic of Gupta and Ruiz-Torres (2001), which is Currently regarded as the best heuristic for solving this problem. Experimental results indicate that the CL heuristic outperforms the LISTFIT heuristic in terms of solution quality and computation time. Two distinct procedures, RA1 and RA2, which optimally allocate resources with and without a fixed job sequence, respectively, are applied to evaluate the benefits of resource flexibility. Two heuristics, HI and H2, are proposed by combining the CL procedure with RA1 and RA2, respectively, to solve the problem of combining P parallel to C-max with resource allocation. Computational experiments show the average Solution quality of H2 is 99.65%, ensuring that resources Should be distributed to jobs in advance. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:256 / 266
页数:11
相关论文
共 50 条
  • [41] Single-machine common due-date scheduling with batch delivery costs and resource-dependent processing times
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    Cheng, Shuenn-Ren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5083 - 5099
  • [42] Parallel machine scheduling with time dependent processing times
    Chen, ZL
    DISCRETE APPLIED MATHEMATICS, 1996, 70 (01) : 81 - 93
  • [43] Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times
    Liu, Peng
    Tian, Xiaoyu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [44] Single machine scheduling with resource dependent release times and processing times
    Wang, XL
    Cheng, TCE
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 162 (03) : 727 - 739
  • [45] Scheduling Jobs with Variable Job Processing Times on Unrelated Parallel Machines
    Zhang, Guang-Qian
    Wang, Jian-Jun
    Liu, Ya-Jing
    SCIENTIFIC WORLD JOURNAL, 2014,
  • [46] Just-in-time scheduling with controllable processing times on parallel machines
    Leyvand, Yaron
    Shabtay, Dvir
    Steiner, George
    Yedidsion, Liron
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2010, 19 (03) : 347 - 368
  • [47] Scheduling identical jobs on uniform parallel machines with random processing times
    Dessouky, MI
    Marcellus, RL
    Zhang, L
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) : 109 - 112
  • [48] Scheduling identical jobs on uniform parallel machines with random processing times
    Dessouky, Mohamed I.
    Marcellus, Richard L.
    Zhang, Li
    Computers and Industrial Engineering, 1998, 35 (1-2): : 109 - 112
  • [49] Just-in-time scheduling with controllable processing times on parallel machines
    Yaron Leyvand
    Dvir Shabtay
    George Steiner
    Liron Yedidsion
    Journal of Combinatorial Optimization, 2010, 19 : 347 - 368
  • [50] Preemptive scheduling on uniform parallel machines with controllable job processing times
    Shakhlevich, Natalia V.
    Strusevich, Vitaly A.
    ALGORITHMICA, 2008, 51 (04) : 451 - 473