Scheduling parallel machines with resource-dependent processing times

被引:33
|
作者
Su, Ling-Huey [1 ]
Lien, Chun-Yuan [1 ]
机构
[1] Chung Yuan Christian Univ, Dept Ind Engn, Chungli, Taiwan
关键词
Parallel machines; Resource-dependent processing times; Heuristics; Makespan; BIN-PACKING; JOBS; MAKESPAN; MINIMIZE; LINES;
D O I
10.1016/j.ijpe.2008.10.014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling parallel machines with resource-dependent processing time is common in many operations management, especially in breaking processing bottlenecks in the Theory of Constraint and lean production. This study considers the problem of scheduling a set of jobs on parallel machines when the processing time of each job depends oil the amount of resource consumed. Such scheduling aims to determine the allocation of resources to jobs and jobs to machines to minimize the makespan. The problem has been proven to be NP-hard even for the fixed job processing times. This study first proposes a heuristic called CL for minimizing makespan in the parallel machines problem parallel to C-max) and then compares it with the LISTFIT heuristic of Gupta and Ruiz-Torres (2001), which is Currently regarded as the best heuristic for solving this problem. Experimental results indicate that the CL heuristic outperforms the LISTFIT heuristic in terms of solution quality and computation time. Two distinct procedures, RA1 and RA2, which optimally allocate resources with and without a fixed job sequence, respectively, are applied to evaluate the benefits of resource flexibility. Two heuristics, HI and H2, are proposed by combining the CL procedure with RA1 and RA2, respectively, to solve the problem of combining P parallel to C-max with resource allocation. Computational experiments show the average Solution quality of H2 is 99.65%, ensuring that resources Should be distributed to jobs in advance. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:256 / 266
页数:11
相关论文
共 50 条
  • [31] Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine
    Lu, Yuan-Yuan
    Jin, Jian
    Ji, Ping
    Wang, Ji-Bo
    NEURAL COMPUTING & APPLICATIONS, 2016, 27 (07): : 1993 - 2000
  • [32] Effective meta-heuristics for scheduling on uniform machines with resource-dependent release dates
    Li, Kai
    Yang, Shan-lin
    Leung, Joseph Y. -T.
    Cheng, Ba-yi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5857 - 5872
  • [33] Scheduling jobs with normally distributed processing times on parallel machines
    Novak, Antonin
    Sucha, Premysl
    Novotny, Matej
    Stec, Richard
    Hanzalek, Zdenek
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 422 - 441
  • [34] Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine
    Yuan-Yuan Lu
    Jian Jin
    Ping Ji
    Ji-Bo Wang
    Neural Computing and Applications, 2016, 27 : 1993 - 2000
  • [35] Single-machine scheduling time-dependent jobs with resource-dependent ready times
    Zhu, Valerie C. Y.
    Sun, Linyan
    Sun, Linhui
    Li, Xiaohong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (01) : 84 - 87
  • [36] Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times
    Yaghtin, Mohammad
    Javid, Youness
    JOURNAL OF MODELLING IN MANAGEMENT, 2025, 20 (02) : 477 - 494
  • [37] Scheduling on parallel identical machines with job-rejection and position-dependent processing times
    Gerstl, Enrique
    Mosheiov, Gur
    INFORMATION PROCESSING LETTERS, 2012, 112 (19) : 743 - 747
  • [38] Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times
    Yaghtin, Mohammad
    Javid, Youness
    JOURNAL OF MODELLING IN MANAGEMENT, 2025, 20 (02) : 477 - 494
  • [39] The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
    Shabtay, Dvir
    Steiner, George
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 25 - 40
  • [40] The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
    Dvir Shabtay
    George Steiner
    Annals of Operations Research, 2008, 159 : 25 - 40