Moving SCADA Systems to IaaS Clouds

被引:7
作者
Church, Philip [1 ,3 ]
Mueller, Harald [2 ]
Ryan, Caspar [1 ]
Gogouvitis, Spyridon V. [2 ]
Goscinski, Andrzej [1 ,3 ]
Haitof, Houssam [2 ]
Tari, Zahir [1 ]
机构
[1] RMIT Univ, Sch CS & IT, Melbourne, Vic, Australia
[2] Siemens AG, Corp Technol, Munich, Germany
[3] Deakin Univ, Sch IT, Waurn Ponds, Australia
来源
2015 IEEE INTERNATIONAL CONFERENCE ON SMART CITY/SOCIALCOM/SUSTAINCOM (SMARTCITY) | 2015年
关键词
SCADA; migration; IaaS clouds; performance;
D O I
10.1109/SmartCity.2015.186
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
SCADA systems allow users to monitor and/or control physical devices, processes and events remotely. As these systems are critical to industrial processes, they are often run on highly reliable and dedicated hardware. Moving these SCADA systems to an Infrastructure as a Service (IaaS) cloud, allows for: cheaper deployments, system redundancy support, and increased uptime, however it is not clear to what degree clouds can support the real-time requirements. Experiments were carried out to examine the effects of using cloud resources and public networks have on SCADA systems. Using the "Life-and-Shift" approach, eclipseSCADA was deployed to the NeCTAR research cloud. Performance metrics were collected from the deployed eclipseSCADA system under different loads. From these collected metrics, a series of recommendations are provided for deploying and modifying a SCADA system on IaaS cloud resources.
引用
收藏
页码:908 / 914
页数:7
相关论文
共 16 条
  • [1] Alberta Electric System Operator, 2005, AESO SCADA STAND, P46
  • [2] iLAND: An Enhanced Middleware for Real-Time Reconfiguration of Service Oriented Distributed Real-Time Systems
    Garcia Valls, Marisol
    Rodriguez Lopez, Iago
    Fernandez Villar, Laura
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2013, 9 (01) : 228 - 236
  • [3] Challenges in real-time virtualization and predictable cloud computing
    Garcia-Valls, Marisol
    Cucinotta, Tommaso
    Lu, Chenyang
    [J]. JOURNAL OF SYSTEMS ARCHITECTURE, 2014, 60 (09) : 726 - 740
  • [4] Gartner, 2011, GARTN ID 5 WAYS MIGR
  • [5] Development of a service oriented SCADA system
    Gligor, Adrian
    Turc, Traian
    [J]. INTERNATIONAL CONFERENCE EMERGING MARKETS QUERIES IN FINANCE AND BUSINESS, 2012, 3 : 256 - 261
  • [6] Workflow management for soft real-time interactive applications in virtualized environments
    Gogouvitis, Spyridon
    Konstanteli, Kleopatra
    Waldschmidt, Stefan
    Kousiouris, George
    Katsaros, Gregory
    Menychtas, Andreas
    Kyriazis, Dimosthenis
    Varvarigou, Theodora
    [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2012, 28 (01): : 193 - 209
  • [7] Goose S., 2014, INT T ELECT ENERGY S
  • [8] Goscinski A., 2011, HIGH PERFORMACE COMP
  • [9] Inductive Automation, 2011, CLOUD BAS SCADA SYST
  • [10] Liu M., 2014, CLOUD COMPUTING, V133, P155