Optimal Integration of Phasor Measurement Units in Power Systems Considering Conventional Measurements

被引:61
作者
Azizi, S. [1 ]
Gharehpetian, G. B. [2 ]
Dobakhshari, A. Salehi [3 ]
机构
[1] Univ Tehran, Sch Elect & Comp Engn, Coll Engn, Tehran 14395515, Iran
[2] Amirkabir Univ Technol, Dept Elect Engn, Tehran 158754413, Iran
[3] Sharif Univ Technol, Dept Elect Engn, Tehran 1136511155, Iran
关键词
Contingency; integer linear programming (ILP); observability; optimal PMU placement (OPP); phasor measurement unit (PMU); OPTIMAL PMU PLACEMENT; STATE ESTIMATION; OBSERVABILITY; FORMULATION; ALGORITHM; SEARCH;
D O I
10.1109/TSG.2012.2213279
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an integer linear programming (ILP) framework for the optimal placement of phasor measurement units (PMUs), in the presence of conventional measurements. Furthermore, by the proposed method, the power system remains completely observable during all possible single contingencies for lines and measurement devices. In doing so, the potential of circuit equations associated with both PMUs and conventional measurements as well as the network topology are fully utilized by a system of equations to reach the minimum possible numbers of required PMUs. The limitation of communication channels is also taken into account in the proposed ILP-based framework. The method is implemented on several IEEE test systems which have already been equipped with conventional measurements. The comparison between obtained results of the proposed method and those of other methods reveals its superiority in the modeling of robust PMU placement problem (OPP) in the presence of conventional measurements. As such, a smooth transition from the SCADA-based monitoring system to the PMU-dominated WAMS is ensured. Moreover, this method is successfully applied on three large-scale test systems, which demonstrates it can effectively be employed for robust OPP in realistic power systems.
引用
收藏
页码:1113 / 1121
页数:9
相关论文
共 27 条
  • [21] Optimal PMU placement for full network observability using Tabu search algorithm
    Peng, JN
    Sun, YZ
    Wang, HF
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2006, 28 (04) : 223 - 231
  • [22] Synchronized phasor measurements in power systems
    Phadke, A.G.
    [J]. IEEE Computer Applications in Power, 1993, 6 (02): : 10 - 15
  • [23] Saadat Hadi, 1999, Power System Analysis
  • [24] Optimal PMU placement method for complete topological and numerical observability of power system
    Sodhi, Ranjana
    Srivastava, S. C.
    Singh, S. N.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (09) : 1154 - 1159
  • [25] Xu B, 2004, 2004 IEEE PES POWER SYSTEMS CONFERENCE & EXPOSITION, VOLS 1 - 3, P943
  • [26] Xu B., 2005, PSERC PUB
  • [27] Zheng P., 2006, PHASOR MEASUREMENT U