共 50 条
- [25] Sequencing of an M machine flow shop with setup, processing and removal times separated PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 321 - 325
- [26] Sequencing of an M machine flow shop with setup, processing and removal times separated The International Journal of Advanced Manufacturing Technology, 2006, 30 : 286 - 296
- [28] Sequencing of an M machine flow shop with setup, processing and removal times separated INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (3-4): : 286 - 296
- [29] No-wait parallel flowshop scheduling with transfer and setup times Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2006, 26 (01): : 18 - 25
- [30] Three Machines Flowshop Scheduling Model With Separate Setup Times 2016 INTERNATIONAL CONFERENCE ON EMERGING TRENDS IN COMMUNICATION TECHNOLOGIES (ETCT), 2016,