共 50 条
- [3] Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 1412 - 1416
- [7] Solution models construction for open shop scheduling problem with setup, processing, and removal times separated Journal of the Chinese Institute of Industrial Engineers, 2003, 20 (06): : 565 - 574