The two-stage no-wait/blocking proportionate super shop scheduling problem

被引:7
作者
Koulamas, Christos [1 ]
Panwalkar, S. S. [2 ]
机构
[1] Florida Int Univ, Dept Informat Syst & Business Analyt, Miami, FL 33199 USA
[2] Johns Hopkins Univ, Carey Business Sch, Baltimore, MD USA
关键词
scheduling; dynamic programming; super shop; no wait; blocking; proportionate; ALGORITHM; MACHINE;
D O I
10.1080/00207543.2018.1518603
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We analyze the 'no-wait' proportionate two-stage super shop scheduling problem with the objective of minimising the maximum job completion time (makespan). The existing simple sorting procedures for the open shop and the job shop do not work on the super shop. We show that the problem is still solvable in time using a procedure based on dynamic programming (DP). A unique feature of this procedure is that the state variable is defined based on the number of jobs; thus, reducing the complexity to polynomial. The same procedure solves the super shop problem with the blocking constraint. We also consider the case of machine dominance and show that the problem can be solved in linear time. Finally, we highlight the differences between the super shop with 'no-wait' and 'synchronous' processing modes via a numerical example.
引用
收藏
页码:2956 / 2965
页数:10
相关论文
共 50 条
  • [41] No-Wait Flow Shop scheduling problem: a systematic literature review and bibliometric analysis
    Utama, Dana Marsetiya
    Umamy, Sabila Zahra
    Al-Imron, Cynthia Novel
    RAIRO-OPERATIONS RESEARCH, 2024, 58 (02) : 1281 - 1313
  • [42] A Swarm Intelligence Approach to Flexible Job-Shop Scheduling Problem with No-Wait Constraint in Remanufacturing
    Sundar, Shyam
    Suganthan, P. N.
    Chua, T. J.
    ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, PT II, 2013, 7895 : 593 - +
  • [43] A simple migrating birds optimization algorithm with two search modes to solve the no-wait job shop problem
    Deng, Guanlong
    Wei, Ming
    Zhang, Shuning
    Xu, Mingming
    Jiang, Tianhua
    Wang, Fucai
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 238
  • [44] A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times
    Gong, Hua
    Tang, Lixin
    Duin, C. W.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (05) : 960 - 969
  • [45] Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach
    Samarghandi, Hamed
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 635 - 662
  • [46] A Quantum-PSO Algorithm for No-Wait Flow shop Scheduling Problem
    Chang, Junlin
    An, Fengshuan
    Su, Pizhao
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 179 - +
  • [47] No-wait two stage hybrid flow shop scheduling with genetic and adaptive imperialist competitive algorithms
    Moradinasab, Nazanin
    Shafaei, Rasoul
    Rabiee, Meysam
    Ramezani, Pezhman
    JOURNAL OF EXPERIMENTAL & THEORETICAL ARTIFICIAL INTELLIGENCE, 2013, 25 (02) : 207 - 225
  • [48] Reentrant open shop scheduling problem with time lags and no-wait constraints
    Alioui, Kenza
    Amrouche, Karim
    Boudhar, Mourad
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166
  • [49] An Evolutionary Algorithm Based Hyper-heuristic for the Job-Shop Scheduling Problem with No-Wait Constraint
    Chaurasia, Sachchida Nand
    Sundar, Shyam
    Jung, Donghwi
    Lee, Ho Min
    Kim, Joong Hoon
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 249 - 257
  • [50] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
    Gao, Kaizhou
    Pan, Quanke
    Suganthan, P. N.
    Li, Junqing
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12) : 1563 - 1572