Monitoring during large construction projects

被引:0
|
作者
De Backer, H. [1 ]
Outtier, A. [1 ]
Schotte, K. [1 ]
Stael, D. [1 ]
Nagy, W. [1 ]
Van Bogaert, Ph. [1 ]
机构
[1] Univ Ghent, B-9000 Ghent, Belgium
关键词
STRAIN-GAUGE MEASUREMENTS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In Belgium, a large number of bridges, fly-overs and tunnels were built, all part of the expansion of the railway network. A considerable percentage of the large and medium span bridges amongst them were subjected to test loading, using heavy construction lorries or test trains before completion, during which strains and sometimes accelerations were measured for comparison with the basic design premises. For the study of the long-term behavior of important civil structures, it often becomes necessary to resort to long-term monitoring of certain structural parameters, such as the strains, temperatures, accelerations, and Eigen frequencies of key components. Especially when the nature of the structures necessitates the use of an independent power source for the measurement system and prohibits the use of wired connections with the environment, a fully autonomous measurement system becomes necessary. This research paper discusses such applications and the possible pitfalls in developing such a monitoring system.
引用
收藏
页码:2914 / 2921
页数:8
相关论文
共 50 条
  • [1] Application of information technology in BIM monitoring of construction quality of large construction projects
    Zhang, Xingliang
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2023, 23 (01) : 267 - 284
  • [2] Large Tunnel Construction Projects
    Heerten, G.
    GEOTECHNIK, 2012, 35 (03) : 209 - 209
  • [3] New risk monitoring tools for the construction and erection phase of large industrial projects
    Baker, Alastair
    Salvador, Emanuele
    Forte, Marcello
    Barison, Marco
    Gaiardelli, Paolo
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 2365 - 2372
  • [4] Model of monitoring management for dynamic evaluation on large-scale construction projects
    Song, Yanqiu
    Dai, Dashuang
    Wu, Gang
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7480 - 7483
  • [5] Governance practices of large construction projects
    Rahman, Diraksh
    Dodanwala, Tharindu C.
    Santoso, Djoen San
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (08)
  • [6] MOTIVATING FOREMEN ON LARGE CONSTRUCTION PROJECTS
    SAMELSON, NM
    BORCHERDING, JD
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (01): : 29 - 36
  • [7] SAFETY ON LARGE BUILDING CONSTRUCTION PROJECTS
    HINZE, J
    RABOUD, P
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1988, 114 (02): : 286 - 293
  • [8] MOTIVATING FOREMEN ON LARGE CONSTRUCTION PROJECTS
    TANER, N
    RUSELL, AD
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1981, 107 (01): : 157 - 158
  • [9] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    Int. J. Proj. Manage., 2006, 4 (349-357):
  • [10] MOTIVATING FOREMEN ON LARGE CONSTRUCTION PROJECTS
    MALONEY, WF
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1980, 106 (04): : 620 - 622