Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems

被引:24
作者
Saravanan, M. [1 ]
Haq, A. Noorul [2 ]
机构
[1] RVS Coll Engn & Technol, Dept Mech Engn, Dindigul 624005, Tamil Nadu, India
[2] Deemed Univ, Natl Inst Technol, Dept Prod Engn, Tiruchirappalli 620015, Tamil Nadu, India
关键词
flexible manufacturing systems; scheduling; meta-heuristics; scatter-search approach;
D O I
10.1007/s00170-007-1134-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Many optimization problems from the industrial engineering world (in particular manufacturing systems) are very complex in nature and quite hard to solve by conventional optimization techniques. There has been increasing interest to apply meta-heuristic methods to solve such kinds of hard optimization problems. In this work, a meta-heuristic approach called scatter-search (SS) is applied for scheduling optimization of flexible manufacturing systems by considering multiple objectives, i.e., minimizing the idle time of the machine and minimizing the total penalty cost for not meeting the due date concurrently. Scatter search (SS) contrasts with other evolutionary procedures in that it provides a wide exploration of the search space through intensification and diversification. In addition, it has a unifying principle for joining solutions and they exploit adaptive memory principle to avoid generating or incorporating duplicate solutions at various stages of the problem. In this paper, various meta-heuristic methods are used for solving three different sizes of scheduling problems taken from the literature. The results available for the various existing meta-heuristic methods are compared with results obtained by the scatter-search method. The proposed framework achieves better results for all the three problems and also achieves an average deviation of 16.67% from the best results obtained by other methods.
引用
收藏
页码:978 / 986
页数:9
相关论文
共 35 条
[1]   SCHEDULING JOBS WITH LINEAR DELAY PENALTIES AND SEQUENCE DEPENDENT SETUP COSTS [J].
BARNES, JW ;
VANSTON, LK .
OPERATIONS RESEARCH, 1981, 29 (01) :146-160
[2]  
BEIGEL JE, 1990, INT J COMPUT IND ENG, V19, P81
[3]   The state of the art in simulation study on FMS scheduling: A comprehensive survey [J].
Chan, FTS ;
Chan, HK ;
Lau, HCW .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (11) :830-849
[4]   Dynamic scheduling for a flexible manufacturing system - The pre-emptive approach [J].
Chan, FTS ;
Chan, HK .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2001, 17 (10) :760-768
[5]  
Chan T. S., 1986, International Journal of Advanced Manufacturing Technology, V1, P69, DOI 10.1007/BF02601447
[6]  
Chisman J. A., 1986, International Journal of Advanced Manufacturing Technology, V1, P55, DOI 10.1007/BF02601553
[7]   ROUTING FLEXIBILITY AND PRODUCTION SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
GHOSH, S ;
GAIMON, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 60 (03) :344-364
[8]   ALGORITHMS FOR SOLVING PRODUCTION-SCHEDULING PROBLEMS [J].
GIFFLER, B ;
THOMPSON, GL .
OPERATIONS RESEARCH, 1960, 8 (04) :487-503
[9]  
Glover F, 2000, CONTROL CYBERN, V29, P653
[10]  
Glover F, 1998, LECT NOTES COMPUT SC, V1363, P3