Solving the hybrid flow shop scheduling problem with limited human resource constraint

被引:58
作者
Costa, A. [1 ]
Fernandez-Viagas, V. [2 ]
Framinan, J. M. [2 ]
机构
[1] Univ Catania, DICAR, Vle A Doria 6, I-95125 Catania, Italy
[2] Univ Seville, Ind Management Sch Engn, Camino & Descubrimientos S-N, Seville 41092, Spain
关键词
Metaheuristics; Backtracking search optimization; Tabu search; Workforce; MILP; ANT COLONY OPTIMIZATION; DEPENDENT SETUP TIMES; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; PARALLEL MACHINES; MANUFACTURING SYSTEMS; SEARCH ALGORITHM; BOUND ALGORITHM; SINGLE-SERVER; TABU SEARCH;
D O I
10.1016/j.cie.2020.106545
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, an m-stage hybrid flow shop scheduling problem with limited workforce in charge of performing setup operations is addressed. Indeed, such workforce represents a critical resource since the number of workers assigned to each production stage is lower than the number of machines in the same stage. A novel discrete backtracking search algorithm powered by a tabu search operating through a new encoding structure, denoted as BSATS, is designed for the problem at hand. The proposed metaheuristic has been properly calibrated and then an exhaustive comparison analysis involving several evolutionary algorithms from the relevant literature has been carried out. Additionally, a mixed integer linear programming model has been formalized in order to optimally solve a set of small-sized test cases. The numerical results obtained, together with a consistent convergence analysis, confirm both the effectiveness and the efficiency of the proposed method.
引用
收藏
页数:22
相关论文
共 80 条
[1]   Scheduling two parallel machines with a single server: the general case [J].
Abdekhodaee, AH ;
Wirth, A ;
Gan, HS .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) :994-1009
[2]   Scheduling parallel machines with a single server: some solvable cases and heuristics [J].
Abdekhodaee, AH ;
Wirth, A .
COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (03) :295-315
[3]   Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers [J].
Abyaneh, Sina Hakimzadeh ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (1-4) :309-325
[4]   A job shop scheduling problem with human operators in handicraft production [J].
Agnetis, Alessandro ;
Murgia, Gianluca ;
Sbrilli, Simone .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) :3820-3831
[5]   Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints [J].
Allaoui, H ;
Artiba, A .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 47 (04) :431-450
[6]  
Arthanari T.S., 1971, OPSEARCH, V8, P10
[7]  
Awad M, 2017, P REL MAINT S
[8]  
Baker KeithR., 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[9]   A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server [J].
Bektur, Gulcin ;
Sarac, Tugba .
COMPUTERS & OPERATIONS RESEARCH, 2019, 103 :46-63
[10]   Flow shop scheduling with heterogeneous workers [J].
Benavides, Alexander J. ;
Ritt, Marcus ;
Miralles, Cristobal .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (02) :713-720