RESEARCH ON THE CONSTRUCTION AND APPLICATION OF GROUP FIRE WATER SUPPLY SYSTEM UNDER THE BACKGROUND OF THE INCREASE OF GREEN BUILDINGS

被引:0
|
作者
Li, Jinmei [1 ]
Li, Qiang [1 ]
Yue, Qingchun [2 ]
Li, Jie [3 ]
You, Yayun [1 ]
机构
[1] China Peoples Police Univ, Sch Fire Engn, Langfang 065000, Hebei, Peoples R China
[2] China Peoples Police Univ, Police Law Dept, Langfang 065000, Hebei, Peoples R China
[3] Hebei Fire & Rescue Brigade, Fire Supervis Dept, Shijiazhuang 050000, Hebei, Peoples R China
来源
FRESENIUS ENVIRONMENTAL BULLETIN | 2022年 / 31卷 / 11期
关键词
Green city building group; group fire protection; EPANET software; three-dimensional topology model; fire water supply system; DISTRICT METERING AREAS; DESIGN;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the acceleration of the urbanization process, the development of green buildings and green group fire-fighting pipeline construction technology has become an urgent need to improve the fire safety of smart cities. At present, there are still many weak links in the group fire control at the level of large-scale green city clusters. In this paper, the green city building group A is taken as an example, the group fire water supply system is constructed, and the EPANET simulation software is used to optimize the fire water supply measures. Through this research, the fire water supply system of green city buildings is divided into regional constant high pressure and temporary high pressure fire water supply system according to the pressure. When a fire occurs, the most unfavorable hydrant nozzle is simulated with the diffuser of the node in EPANET, and the optimal value of the diffuser coefficient is 1.342. In addition, a three-dimensional topological model of the outdoor fire-fighting pipe network of the temporary high-pressure fire-fighting water supply system of a green city building was established, and the water supply route for the partition of the indoor fire hydrant system was formulated. EPANET software is used for the optimized design of the group fire protection pipe network. It is feasible to adjust the pressure after the pressure reduces valve group of the fire pump room in the southeast area of this study from 0.8 MPa to 0.6 MPa. The optimized scheme in this paper realizes the sharing of pools, pump rooms, and water tanks of the three regional fire water supply systems. Compared with the independent operation of each system, it improves the fire fighting efficiency and increases the reliability of fire water supply.
引用
收藏
页码:10592 / 10598
页数:7
相关论文
共 50 条
  • [1] Construction and Research of Water Reuse System in Green Intelligent Buildings
    Li Y.
    Zhong H.
    Archives des Sciences, 2024, 74 (01): : 92 - 101
  • [2] Construction of water supply and drainage fire water system of construction project under BIM technology
    Chen X.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [3] Design and Optimization of the Annular Water Supply System of Fire Hydrant in Buildings
    Li Jing-Miao
    Du Guo-Jun
    AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (01): : 1275 - 1279
  • [4] Design and optimization of the annular water supply system of fire hydrant in buildings
    Li, Jing-Miao, 1600, TeknoScienze, Viale Brianza,22, Milano, 20127, Italy (28):
  • [5] Cleaner construction of durable green rooftop in residential buildings with municipal water supply
    Jittin, V.
    Tripti, S. R.
    Bahurudeen, A.
    Hammadhu, R. J.
    CLEANER MATERIALS, 2022, 5
  • [6] Research and Application of Fire Risk Assessment System for Marketplace Buildings
    Yang, Jun-tao
    Chen, Ye
    2013 INTERNATIONAL CONFERENCE ON PERFORMANCE-BASED FIRE AND FIRE PROTECTION ENGINEERING (ICPFFPE 2013), 2014, 71 : 476 - 480
  • [7] A Study on the Reliability of Fire Water Supply System in High-rise Buildings
    Yang Qi
    Fire Technology, 2002, 38 : 71 - 79
  • [8] A study on the reliability of fire water supply system in high-rise buildings
    Qi, Y
    FIRE TECHNOLOGY, 2002, 38 (01) : 71 - 79
  • [9] Research on the Construction of Double Qualified Teachers under the Background of Supply Side Reform
    Zhang, Shuang
    2017 6TH INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2017), PT 2, 2017, 98 : 451 - 455
  • [10] Research on the integrated application of green construction design of prefabricated buildings based on BIM
    Xu, Bin
    Zhang, Yali
    Liu, Yuejun
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2020, 126 : 153 - 153